Contractor · Electrical
peter j anderson
146 building permits since 2020 in Randolph Town city, MA; Stoughton town, MA and Attleboro city, MA, across 10 counties — $2,981,891 in reported job value over 108 permits that state one.
- Building permits
- 146
- Reported job value
- $3M
- Active
- 2020–2026
- Latest permit
- Oct 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Randolph Town city, MA21
- Stoughton town, MA19
- Attleboro city, MA18
- Foxborough town, MA17
- Bridgewater Town city, MA13
- Taunton city, MA9
- Bellingham town, MA8
- Falmouth town, MA7
- Rockland town, MA5
- Fairhaven town, MA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2022 | 1 |
| 2023 | 53 |
| 2024 | 28 |
| 2025 | 45 |
| 2026 (YTD) | 17 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical144
- Solar95
- Battery storage92
- HVAC7
- Electric meters7
- Heat pumps5
- EV chargers2
- Kitchens1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- ELECT.129
- ELECT8
- Electrical Permit5
- Building1
- Electrical Permit: Residential1
- Electrical Permit - RESIDENTIAL ONLY1
- Residential Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 2, 2026 | ELECT. | Main Breaker Kit | Norwell Town | $500 |
| Jul 27, 2026 | ELECT. | — | Attleboro City | — |
| Jul 15, 2026 | ELECT | 7.740 kw, rooftop mounted, solar pv system (18 panels) no battery. main electrical panel relocation. | Bellingham Town | $23,266 |
| Jun 23, 2026 | ELECT. | Physical securement of the existing exterior meter socket to ensure it is safely and firmly anchored to the building wall. | Foxborough Town | $50 |
| Jun 11, 2026 | ELECT. | — | Attleboro City | — |
| Jun 8, 2026 | ELECT. | 6 zone ductless system ( 6 mini splits and 2 condensers) main panel swap | Rockland Town | $33,000 |
| May 21, 2026 | ELECT | sub panel replacement/addition. main electrical panel relocation (up to 6 feet). swap hvac equipment | Bellingham Town | $4,950 |
| Mar 20, 2026 | ELECT. | 15.910 KW. Rooftop Mounted, Solar PV System (37 panels) No Battery | Bridgewater Town City | $42,193 |
Permit status
Where its permits stand, as the departments report them.
- Issued66
- Completed45
- Finaled17
- Closed7
- Active3
- Revoked2
- Cancelled2
- Expired1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.