Contractor · Electrical

QUANTUM SOLAR DESIGNS INC

147 building permits since 2014 in Los Angeles city, CA; Burbank city, CA and Thousand Oaks city, CA, across 2 counties — $149,000 in reported job value over 3 permits that state one.

Building permits
147
Reported job value
$149K
Active
2014–2026
Latest permit
Jan 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA141
  • Burbank city, CA2
  • Thousand Oaks city, CA2
  • West Hollywood city, CA2

Permits by year

By issue date (application date where there is none).

01530
28
201420162018202020222026*
* 2026 is year to date.
View as table
YearPermits
20142
20154
201618
201711
201818
201928
202024
202118
202219
20231
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical145
  • Solar28
  • Roofing3
  • Battery storage2
  • New construction2

Permit types

As the building departments classify them.

  • Electrical142
  • Bldg-New2
  • Electrical Service1
  • Electrical Solar Permit1
  • Legacy - Electrical - New1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 22, 2026Electrical5.5kw roof mounted solar photovoltaic system. 20 panels flush mounted to roof.Thousand Oaks City—
Jan 21, 2026ElectricalExisting service panel upgrade to energize the solar photovoltaic system installation under permitLos Angeles City—
Jan 21, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Jan 6, 2026Electrical4.84kw roof mounted solar photovoltaic system. 11 panels flush mounted to roof. With 11.5kw battery backup system.Thousand Oaks City—
Jan 25, 2023Electrical—Los Angeles City—
Dec 19, 2022Electrical—Los Angeles City—
Nov 28, 2022Electrical—Los Angeles City—
Nov 22, 2022Electrical—Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated137
  • Finaled7
  • Issued2
  • Active1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.