Contractor · Plumbing

TOM BYRD PLUMBING INC.

148 building permits since 1992 in St. Louis County, MO; Chesterfield city, MO and Creve Coeur city, MO, across 2 counties — $389,624 in reported job value over 147 permits that state one.

Building permits
148
Reported job value
$389.6K
Active
1992–2026
Latest permit
Nov 4, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • St. Louis County, MO88
  • Chesterfield city, MO24
  • Creve Coeur city, MO6
  • Wildwood city, MO6
  • Bridgeton city, MO4
  • Town and Country city, MO3
  • Calverton Park city, MO2
  • Crestwood city, MO2
  • Bellefontaine Neighbors city, MO1
  • Crystal Lake Park city, MO1

Permits by year

By issue date (application date where there is none).

050100
94
199220202026*
* 2026 is year to date.
View as table
YearPermits
19921
202053
2026 (YTD)94

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing144
  • Water heaters67
  • Gas27
  • Bathrooms26
  • Electrical23
  • Kitchens10
  • Remodels10

Permit types

As the building departments classify them.

  • PLUMBING RESIDENTIAL WATER HEATER43
  • PLUMBING RESIDENTIAL PLUMBING39
  • PLUMBING RESIDENTIAL BACKFLOW19
  • PLUMBING MULTIFAMILY WATER HEATER16
  • PLUMBING COMMERCIAL BACKFLOW12
  • PLUMBING COMMERCIAL PLUMBING9
  • BUILDING RESIDENTIAL EXISTING BUILDING (INTEGRATED/NON-INTEGRATED)4
  • PLUMBING RESIDENTIAL WATER SERVICE PROGRAM4

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 4, 2026PLUMBING MULTIFAMILY WATER HEATERWe are replacing a 38 gallon electric Lowboy water heater and expansion tank with same. The water heater and expansion tank are customer supplied. This water heSt. Louis County$1,500
Nov 4, 2026PLUMBING MULTIFAMILY WATER HEATERWe are replacing a 38 gallon electric Lowboy water heater and expansion tank with same. The water heater and expansion tank are customer supplied. This water heChesterfield$1,500
Nov 4, 2026PLUMBING RESIDENTIAL WATER HEATER***PLEASE REAPPLY AS MULTI-FAMILY INSTEAD OF RESIDENTIAL.THANK YOU.***We are replacing a 38 gallon electric Lowboy water heater and expansion tank with same. ThChesterfield$1,500
Nov 4, 2026PLUMBING RESIDENTIAL WATER HEATER***PLEASE REAPPLY AS MULTI-FAMILY INSTEAD OF RESIDENTIAL.THANK YOU.***We are replacing a 38 gallon electric Lowboy water heater and expansion tank with same. ThSt. Louis County$1,500
Oct 30, 2026PLUMBING COMMERCIAL PLUMBINGWe shall replace existing fixtures in mens & ladies restroom and install a tankless water heater, the tankless does not have gallons. We shall move the existingSt. Louis County$28,275
Oct 30, 2026PLUMBING COMMERCIAL PLUMBINGWe shall replace existing fixtures in mens & ladies restroom and install a tankless water heater, the tankless does not have gallons. We shall move the existingCreve Coeur City$28,275
Oct 29, 2026PLUMBING RESIDENTIAL WATER HEATERReplacing failed 40-gallon electric water heater with customer supplied same.St. Louis County$1,300
Oct 29, 2026PLUMBING RESIDENTIAL WATER HEATERReplacing failed 40-gallon electric water heater with customer supplied same.Chesterfield$1,300

Permit status

Where its permits stand, as the departments report them.

  • Completed105
  • Void23
  • Issued16
  • Cancelled4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.