Contractor · Electrical
EDWARD ODOM
148 building permits since 2020 in Memphis city, TN; Shelby County, TN and Germantown city, TN — $81,000 in reported job value over 1 permits that state one.
- Building permits
- 148
- Reported job value
- $81K
- Active
- 2020–2026
- Latest permit
- Sep 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Memphis city, TN120
- Shelby County, TN16
- Germantown city, TN7
- Lakeland city, TN3
- Millington city, TN2
Permits by year
By issue date (application date where there is none).
02040
38
2020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 4 |
| 2021 | 38 |
| 2022 | 29 |
| 2023 | 24 |
| 2024 | 23 |
| 2025 | 13 |
| 2026 (YTD) | 17 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical144
- HVAC16
- Additions9
- Generators8
- Remodels7
- New construction6
- Battery storage4
- Demolition4
- Electric meters4
- Gas3
Permit types
As the building departments classify them.
- COMMERCIAL ELECTRICAL PERMIT144
- SIGN PERMIT (PERMANENT SIGNS)3
- COMMERCIAL NEW CONSTRUCTION PERMIT1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 16, 2026 | COMMERCIAL ELECTRICAL PERMIT | Add 20-amp circuit for water heater & valve | Germantown city | — |
| Aug 10, 2026 | COMMERCIAL ELECTRICAL PERMIT | Running a 60amp 3 phase 208voltfeed for a small sort conveyor. Running 120volt 20amp power for convenience outlets on conveyor. Running a 40amp 3 phase 208volt | Memphis city | — |
| Aug 10, 2026 | COMMERCIAL ELECTRICAL PERMIT | Remodeling of the men's and women's restrooms on all 4 floors. Includes remodel for the 4th floor breakroom and the addition of 3 fire alarm devices on the 4th | Memphis city | — |
| Jul 21, 2026 | COMMERCIAL ELECTRICAL PERMIT | Replace light fixtures. Add two new roof top units. Install circuits for two overhead coiling doors. Install circuits for two heaters in mechanical room. | Memphis city | — |
| Jul 17, 2026 | COMMERCIAL ELECTRICAL PERMIT | Run conduit and pull fire alarm cable, terminate FA relays and test system. | Memphis city | — |
| Jul 6, 2026 | COMMERCIAL ELECTRICAL PERMIT | Moving MLGW transformer and reworking secondary service feed 1600A / 480V to building. | Memphis city | — |
| Jun 26, 2026 | COMMERCIAL ELECTRICAL PERMIT | New 100A 240V temp service for office trailer. | Memphis city | — |
| Jun 24, 2026 | COMMERCIAL ELECTRICAL PERMIT | Installing fire alarm, camera system, access controls for phase 3 addition/renovation | Memphis city | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.