Contractor · Specialty (solar, fire, telecom)
PRECIS SOLAR
149 building permits since 2013 in Riverside city, CA; San Diego County, CA and Temecula city, CA, across 5 counties — $1,178,335 in reported job value over 44 permits that state one.
- Building permits
- 149
- Reported job value
- $1.2M
- Active
- 2013–2025
- Latest permit
- May 15, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Riverside city, CA44
- San Diego County, CA33
- Temecula city, CA19
- Vista city, CA18
- Norwalk city, CA16
- Los Angeles city, CA8
- Oceanside city, CA7
- Anaheim city, CA2
- Redlands city, CA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2015 | 2 |
| 2016 | 24 |
| 2017 | 5 |
| 2018 | 10 |
| 2019 | 12 |
| 2020 | 6 |
| 2021 | 21 |
| 2022 | 20 |
| 2023 | 36 |
| 2024 | 8 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar121
- Roofing39
- Electrical22
- Battery storage12
- Electric meters3
- EV chargers1
Permit types
As the building departments classify them.
- BRES25
- Residential19
- BLDG - Building (R)18
- Building Misc - Photovoltaic System (PV)17
- Electrical8
- Solar Panel6
- Solar Panel - Residential & PC6
- Electrical Residential solar panel3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 15, 2025 | BLDG - Electrical (R) | Online installation of15kWh (2) Energy Storage System onto existing system- Snellen Residence | Temecula City | — |
| Dec 26, 2024 | BLDG - Building (R) | Online. Roof mount solar 10 panels 4.200 kw with (4) enphase ESS adding to existing solar. Bhatia residence | Temecula City | — |
| Jul 12, 2024 | SFD SOLAR PV - ENERGY STORAGE SYSTEM | Rooftop PV Solar installation and ESS - NOT SA+ ELIGIBLE | Oceanside City | — |
| Jul 1, 2024 | SFD SOLAR PV - ENERGY STORAGE SYSTEM | Rooftop PV Solar installation | Oceanside City | — |
| Apr 18, 2024 | BLDG - Building (R) | Online Roof mount solar adding to existing system 28 panels 12.320kw with 2 ESS Campagna Residence | Temecula City | — |
| Apr 8, 2024 | Residential | UPGRADE ELECTRIC SERVICE (METER) PANEL FROM 100 AMPS TO 200 AMPS | Riverside City | $2,000 |
| Mar 8, 2024 | Residential | INSTALL PV SYSTEM ON RESIDENTIAL ROOF: 23 PANELS & 8.050 KW DC | Riverside City | $27,000 |
| Feb 13, 2024 | Residential | INSTALL PV SYSTEM WITH 31 PANELS AND 12.4 KW ON RESIDENTIAL ROOF | Riverside City | $40,000 |
Permit status
Where its permits stand, as the departments report them.
- Finaled49
- Issued36
- Completed29
- Active12
- Not stated11
- Withdrawn5
- Expired2
- Reviews in progress2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.