Contractor · Electrical
ENERGY RENOVATION CENTER
149 building permits since 2016 in Los Angeles city, CA; Riverside city, CA and San Diego County, CA, across 8 counties — $647,151 in reported job value over 64 permits that state one.
- Building permits
- 149
- Reported job value
- $647.2K
- Active
- 2016–2026
- Latest permit
- Feb 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA62
- Riverside city, CA55
- San Diego County, CA12
- Temecula city, CA6
- Redlands city, CA4
- Oceanside city, CA3
- Anaheim city, CA2
- Norwalk city, CA2
- Madera city, CA1
- Merced city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 17 |
| 2017 | 20 |
| 2018 | 7 |
| 2019 | 16 |
| 2020 | 27 |
| 2021 | 28 |
| 2022 | 13 |
| 2023 | 16 |
| 2024 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical84
- Solar80
- Roofing42
- Electric meters7
- Battery storage2
- HVAC1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- Electrical56
- Residential38
- BRES17
- Bldg-Alter/Repair7
- BLDG - Building (R)5
- B-BSP Solar4
- BLD SOLAR PV RES2
- BLDG - Electrical (R)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 24, 2026 | Electrical | Install new flush roof-mounted, low-profile pv solar system to an existing pv solar permit (2022-4348-b-0-0-0) . Total solar panel modules quantity: 8 total inv | Thousand Oaks City | — |
| Jul 29, 2025 | ENERGY STORAGE SYSTEM - SIMPLE | Install - (1) Tesla PW3 Battery and (1) Tesla Back Up Switch | Oceanside City | — |
| Mar 12, 2024 | Residential | INSTALL PV SYSTEM WITH 14 PANELS AND 5.67 KW ON RESIDENTIAL ROOF **** PANEL UPGRADE ON SEPARATE PERMIT. **** | Riverside City | $5,970 |
| Dec 15, 2023 | Residential Electrical | (2) ENPHASE BATTERIES, (1) N 125 AMP LOAD CENTER PC:BS2304963. | Norwalk City | — |
| Dec 15, 2023 | Solar Panel | NEW PV SOLAR PHOTOVOLTAIC 6.48 KW DC SYSTEM WITH (16) SEG 405KW MODULES: (16) MICROINVERTER: ENPHASE, (1) COMBINER BOX. PC:BS2304963. | Norwalk City | — |
| Dec 7, 2023 | BLDG - Building (R) | Online / Roof mount PV 7.70 kW / 19 panels / 19 microinverters / MPU on permit B23-7121 / Hernandez residence | Temecula City | — |
| Dec 7, 2023 | BLDG - Electrical (R) | Online / MPU for PV permit B23-7120 / Hernandez residence | Temecula City | — |
| Dec 5, 2023 | Residential | UPGRADE ELECTRICAL SERVICE TO 200 AMPS | Riverside City | $2,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated57
- Completed39
- Finaled31
- Issued14
- Active5
- Withdrawn2
- Expired1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.