Contractor · Electrical
Power Up Solutions LLC
150 building permits since 2024 in Merced city, CA; San Diego city, CA and Moreno Valley city, CA, across 19 counties — $2,191,967 in reported job value over 70 permits that state one.
- Building permits
- 150
- Reported job value
- $2.2M
- Active
- 2024–2026
- Latest permit
- Oct 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Merced city, CA26
- San Diego city, CA18
- Moreno Valley city, CA13
- Sacramento city, CA10
- Tuolumne County, CA8
- Santa Cruz city, CA7
- Riverside city, CA6
- Oakland city, CA4
- Temecula city, CA4
- Contra Costa County, CA3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 21 |
| 2025 | 28 |
| 2026 (YTD) | 100 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar110
- Electrical90
- Battery storage70
- Plumbing23
- Roofing18
- HVAC14
- Water heaters9
- Windows & doors8
- Electric meters5
- New construction2
Permit types
As the building departments classify them.
- Electrical72
- PHOTOVOLTAIC SYSTEMS9
- Residential Roof Mount Solar (15 kw or less)7
- Solar7
- Residential6
- Single Family6
- SolarAPP6
- BLDG - Building (R)4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 14, 2026 | Residential | (N) 200 AMP SUBPANEL | Riverside City | $5,000 |
| Sep 29, 2026 | Residential Roof Mount Solar (15 kw or less) | — | Tuolumne County | $56,000 |
| Sep 23, 2026 | Residential Roof Mount Solar (15 kw or less) | — | Tuolumne County | $47,000 |
| Sep 18, 2026 | SolarApp | SolarApp ID: SA20260918-2133-542-11950-A; 10.250 kW roof-mounted solar PV, 25 new modules, 1 new battery, 1 battery expansion, new sub panel 225 A | Sacramento County | $50,000 |
| Sep 3, 2026 | PVR | PV SOLAR ROOF MOUNT 15 PANELS / 6.15 kW DC & 1 ESS BATTERY & MPU to 125A | Contra Costa County | $30,000 |
| Sep 3, 2026 | Single Family | Reviewed by SolarApp+ 3.3kw Solar PV System, 11.5 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $18,000 |
| Aug 18, 2026 | Residential Roof Mount Solar (15 kw or less) | — | Tuolumne County | $25,000 |
| Aug 11, 2026 | Residential Roof Mount Solar (15 kw or less) | — | Tuolumne County | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Finaled50
- Issued42
- Active26
- Not stated12
- Completed10
- Closed3
- Expired2
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.