Contractor · Specialty (solar, fire, telecom)
BEDROCK SOLAR
151 building permits since 2016 in San Diego County, CA; Oceanside city, CA and Vista city, CA, across 3 counties — $171,500 in reported job value over 2 permits that state one.
- Building permits
- 151
- Reported job value
- $171.5K
- Active
- 2016–2025
- Latest permit
- Oct 21, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- San Diego County, CA125
- Oceanside city, CA19
- Vista city, CA5
- Anaheim city, CA1
- Los Angeles city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 3 |
| 2017 | 11 |
| 2018 | 9 |
| 2019 | 12 |
| 2020 | 18 |
| 2021 | 33 |
| 2022 | 16 |
| 2023 | 44 |
| 2024 | 4 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar143
- Battery storage13
- Electrical7
- Roofing3
- Electric meters3
Permit types
As the building departments classify them.
- Existing9
- SFD SOLAR PV - SIMPLE6
- Building Misc - Photovoltaic System (PV)5
- BLD SOLAR PV RES4
- BLD RESIDENTIAL PME - SIMPLE3
- BLD SOLAR PV RES - PV WITH UPGRADE3
- BLD MOBILE HOME - ACCESSORY1
- BLD SOLAR PV COMM1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 21, 2025 | SFD SOLAR PV | 10 PV solar modules / roof mounted / no energy backup | Oceanside City | — |
| Nov 21, 2024 | BLD SOLAR PV RES - PV WITH UPGRADE | INSTALL 15 PANELS (440 W) ROOF MOUNTED | Oceanside City | — |
| Apr 1, 2024 | BLD SOLAR PV COMM | INSTALLATION OF 60 PV SOLAR PANELS / MICRO INVERTERS ON ROO | Oceanside City | — |
| Mar 18, 2024 | SFD SOLAR PV - SIMPLE | Installation of 60 PV solar panels on roof. No battery back- | Oceanside City | — |
| Jan 24, 2024 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM | Vista City | — |
| Nov 20, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures fr | San Diego County | — |
| Nov 20, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures fr | San Diego County | — |
| Oct 31, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures fr | San Diego County | — |
Permit status
Where its permits stand, as the departments report them.
- Issued58
- Active36
- Completed31
- Finaled23
- Not stated2
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.