Contractor · Plumbing
LARKIN, DANIEL
152 building permits since 2020 in St. Louis County, MO; Chesterfield city, MO and Creve Coeur city, MO — $417,035 in reported job value over 151 permits that state one.
- Building permits
- 152
- Reported job value
- $417K
- Active
- 2020
- Latest permit
- Dec 30, 2020
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- St. Louis County, MO98
- Chesterfield city, MO5
- Creve Coeur city, MO4
- Richmond Heights city, MO4
- Wildwood city, MO4
- Hazelwood city, MO3
- Maryland Heights city, MO3
- Rock Hill city, MO3
- Frontenac city, MO2
- Maplewood city, MO2
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing147
- Water heaters52
- Bathrooms28
- Gas18
- New construction10
- Kitchens8
- HVAC3
- Electrical3
- Grading & excavation2
- Demolition2
Permit types
As the building departments classify them.
- PLUMBING RESIDENTIAL PLUMBING70
- PLUMBING RESIDENTIAL WATER HEATER36
- PLUMBING COMMERCIAL PLUMBING12
- PLUMBING RESIDENTIAL WATER SERVICE PROGRAM11
- DRAINLAYING RESIDENTIAL DRAINLAYING4
- PLUMBING RESIDENTIAL BACKFLOW4
- PLUMBING MULTIFAMILY PLUMBING3
- PLUMBING MULTIFAMILY WATER HEATER3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 30, 2020 | PLUMBING RESIDENTIAL PLUMBING | as part of the missouri american water program we are moving the water meter from the inside to the outside | St. Louis County | $1,695 |
| Dec 30, 2020 | PLUMBING RESIDENTIAL PLUMBING | as part of the missouri american water program we are moving the water meter from the inside to the outside | St. Ann City | $1,695 |
| Dec 23, 2020 | PLUMBING RESIDENTIAL PLUMBING | drain replacement under slab to include 1 toilet and partial stack replacement up to cleanout. install new lavatory drain from stack to sink on 1st floor | St. Louis County | $3,200 |
| Dec 23, 2020 | PLUMBING RESIDENTIAL PLUMBING | drain replacement under slab to include 1 toilet and partial stack replacement up to cleanout. install new lavatory drain from stack to sink on 1st floor | Bel-Nor Village | $3,200 |
| Dec 16, 2020 | PLUMBING RESIDENTIAL PLUMBING | Install water service in new home | St. Louis County | $1,675 |
| Dec 16, 2020 | PLUMBING RESIDENTIAL PLUMBING | replace stack from just above basement floor up to just above drain arm on vanity in hall bath to include drain arms for two sinks, two toilets, and one tub and | St. Louis County | $5,075 |
| Dec 16, 2020 | PLUMBING RESIDENTIAL PLUMBING | Install water service in new home | Chesterfield | $1,675 |
| Dec 2, 2020 | PLUMBING RESIDENTIAL WATER HEATER | REPLACING EXISTING UNIT WITH NEW 50-GALLON GAS WATER HEATER. | St. Louis County | $1,800 |
Permit status
Where its permits stand, as the departments report them.
- Completed118
- Issued17
- Void11
- Cancelled6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.