Contractor · Plumbing

LARKIN, DANIEL

152 building permits since 2020 in St. Louis County, MO; Chesterfield city, MO and Creve Coeur city, MO — $417,035 in reported job value over 151 permits that state one.

Building permits
152
Reported job value
$417K
Active
2020
Latest permit
Dec 30, 2020

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • St. Louis County, MO98
  • Chesterfield city, MO5
  • Creve Coeur city, MO4
  • Richmond Heights city, MO4
  • Wildwood city, MO4
  • Hazelwood city, MO3
  • Maryland Heights city, MO3
  • Rock Hill city, MO3
  • Frontenac city, MO2
  • Maplewood city, MO2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing147
  • Water heaters52
  • Bathrooms28
  • Gas18
  • New construction10
  • Kitchens8
  • HVAC3
  • Electrical3
  • Grading & excavation2
  • Demolition2

Permit types

As the building departments classify them.

  • PLUMBING RESIDENTIAL PLUMBING70
  • PLUMBING RESIDENTIAL WATER HEATER36
  • PLUMBING COMMERCIAL PLUMBING12
  • PLUMBING RESIDENTIAL WATER SERVICE PROGRAM11
  • DRAINLAYING RESIDENTIAL DRAINLAYING4
  • PLUMBING RESIDENTIAL BACKFLOW4
  • PLUMBING MULTIFAMILY PLUMBING3
  • PLUMBING MULTIFAMILY WATER HEATER3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 30, 2020PLUMBING RESIDENTIAL PLUMBINGas part of the missouri american water program we are moving the water meter from the inside to the outsideSt. Louis County$1,695
Dec 30, 2020PLUMBING RESIDENTIAL PLUMBINGas part of the missouri american water program we are moving the water meter from the inside to the outsideSt. Ann City$1,695
Dec 23, 2020PLUMBING RESIDENTIAL PLUMBINGdrain replacement under slab to include 1 toilet and partial stack replacement up to cleanout. install new lavatory drain from stack to sink on 1st floorSt. Louis County$3,200
Dec 23, 2020PLUMBING RESIDENTIAL PLUMBINGdrain replacement under slab to include 1 toilet and partial stack replacement up to cleanout. install new lavatory drain from stack to sink on 1st floorBel-Nor Village$3,200
Dec 16, 2020PLUMBING RESIDENTIAL PLUMBINGInstall water service in new homeSt. Louis County$1,675
Dec 16, 2020PLUMBING RESIDENTIAL PLUMBINGreplace stack from just above basement floor up to just above drain arm on vanity in hall bath to include drain arms for two sinks, two toilets, and one tub andSt. Louis County$5,075
Dec 16, 2020PLUMBING RESIDENTIAL PLUMBINGInstall water service in new homeChesterfield$1,675
Dec 2, 2020PLUMBING RESIDENTIAL WATER HEATERREPLACING EXISTING UNIT WITH NEW 50-GALLON GAS WATER HEATER.St. Louis County$1,800

Permit status

Where its permits stand, as the departments report them.

  • Completed118
  • Issued17
  • Void11
  • Cancelled6

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.