Contractor · Electrical
DUNCAN SEAWALL DOCK & BOAT LIFT
1,311 building permits since 2001 in Sarasota city, FL; Charlotte County, FL and North Port city, FL, across 4 counties — $45,312,934 in reported job value over 1,288 permits that state one.
- Building permits
- 1,311
- Reported job value
- $45.3M
- Active
- 2001–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sarasota city, FL963
- Charlotte County, FL334
- North Port city, FL8
- Punta Gorda city, FL2
- Venice city, FL2
- DeSoto County, FL1
- Duval County, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2001 | 4 |
| 2002 | 50 |
| 2003 | 75 |
| 2004 | 105 |
| 2005 | 74 |
| 2006 | 55 |
| 2007 | 41 |
| 2008 | 45 |
| 2009 | 32 |
| 2010 | 48 |
| 2011 | 51 |
| 2012 | 50 |
| 2013 | 75 |
| 2014 | 67 |
| 2015 | 70 |
| 2016 | 50 |
| 2017 | 47 |
| 2018 | 52 |
| 2019 | 40 |
| 2020 | 39 |
| 2021 | 53 |
| 2022 | 32 |
| 2023 | 29 |
| 2024 | 61 |
| 2025 | 34 |
| 2026 (YTD) | 32 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical38
- Demolition10
- Grading & excavation5
- Roofing3
- Additions3
- Pools & hot tubs2
- Solar1
- Remodels1
- New construction1
Permit types
As the building departments classify them.
- Building and Zoning963
- Building/Accessories/Residential/Dock117
- Building/Accessories/Residential/Boatlift58
- Residential Dock58
- Residential Boatlift36
- Residential Seawall30
- Building/Accessories/Residential/Seawall17
- Commercial Dock6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | Building and Zoning | Remove existing boat house and existing lift under boat house then replace the boat lift (boat house will not be replaced). Replace substructure and decking onl | Sarasota City | $42,260 |
| Oct 20, 2026 | Building and Zoning | Install vinyl seawall with concrete cap and tiebacks in front of existing wall after docks as needed to facilitate new seawall. Remove and replace concrete side | Sarasota City | $864,534 |
| Oct 19, 2026 | Building and Zoning | Construct dock and upland walkway, install kayak lift | Sarasota City | $144,700 |
| Oct 14, 2026 | Building and Zoning | Replace boat lift in slip PHC | Sarasota City | $30,000 |
| Sep 25, 2026 | Building and Zoning | Install boat lift in slip 906 relocated from slip 936 | Sarasota City | $16,291 |
| Sep 25, 2026 | Building and Zoning | Install boat lift and hand crank kayak launch. | Sarasota City | $27,500 |
| Sep 9, 2026 | Building and Zoning | Remove remains of existing dock and pilings, rebuild dock, install 2 boat lifts and an activity lift. | Sarasota City | $117,200 |
| Sep 8, 2026 | Building and Zoning | Construct retaining wall landward of MHWL | Sarasota City | $113,179 |
Permit status
Where its permits stand, as the departments report them.
- Closed1.2K
- Withdrawn36
- Stop work ordered17
- Cancelled15
- Expired9
- Pending7
- Issued6
- Finaled3
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- DUNCAN SEAWALL DOCK AND BOAT LIFT LLC
- DUNCAN SEAWALL DOCK AND BOATLIFT
- DUNCAN SEAWALL DOCK BOATLIFT
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.