Contractor · Electrical
Hernan Suquilanda
155 building permits since 2014 in Stamford town, CT; New Milford town, CT and Ridgefield town, CT, across 7 counties — $957,481 in reported job value over 132 permits that state one.
- Building permits
- 155
- Reported job value
- $957.5K
- Active
- 2014–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT45
- New Milford town, CT27
- Ridgefield town, CT13
- Bristol town, CT12
- New Fairfield town, CT11
- Brookfield town, CT8
- Darien town, CT8
- Redding town, CT7
- New Canaan town, CT5
- Stratford town, CT4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 3 |
| 2015 | 1 |
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 5 |
| 2019 | 4 |
| 2020 | 5 |
| 2021 | 11 |
| 2022 | 19 |
| 2023 | 36 |
| 2024 | 25 |
| 2025 | 18 |
| 2026 (YTD) | 26 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical151
- Kitchens23
- HVAC22
- Bathrooms19
- Generators17
- Pools & hot tubs14
- Additions9
- Electric meters9
- Heat pumps7
- Solar4
Permit types
As the building departments classify them.
- Electrical Permit125
- Electrical Permit Application10
- Electrical (& Portable Generators)7
- Electrical Permit and Voice/Data -NOT TO BE USED FOR GENERATORS OR FIRE ALARMS3
- Electrical2
- ELECTRICAL2
- HVAC/Mechanical Permit2
- EL21
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | Electrical Permit | UPGRADE SWITCHES OUTLETS AND LIGHT FIXTURES | Brookfield Town | $3,600 |
| Oct 14, 2026 | Electrical Permit | WIRE A 16 UNIT APARMENT ALL ELECTRICAL 800 AMP SERVICE | New Milford Town | — |
| Oct 13, 2026 | ELECTRICAL | NAIL SALON: WIRE AND INSTALL 2 15 AMP MINI SPLIT UNITS | Bethel Town | $1,800 |
| Sep 24, 2026 | Electrical Permit | ROUGH AND FINISNISH TWO APARMENT AND INSTALL NEW 2 GANG METER BOX 100AMP EACH | Bristol Town | $25,000 |
| Sep 3, 2026 | Electrical Permit | Temporarily disconnect and remove the existing roof-mounted solar photovoltaic (PV) panels and associated mounting components as necessary to allow for roof rep | Stamford Town | $3,200 |
| Aug 26, 2026 | Electrical Permit | Electrical Scope of Work: Temporarily disconnect and remove the existing PV solar panels to allow the roofing contractor to replace the existing roof. After com | Brookfield Town | $4 |
| Aug 7, 2026 | Electrical Permit | new 800 amp service with 16 meters one owners wire 16 apartments all electrical and common areas | New Milford Town | — |
| Jul 24, 2026 | Electrical Permit | Replace and secure existing electrical outlets and switches throughout the residence. Verify that the existing devices are properly connected, grounded, secured | Brookfield Town | $4,183 |
Permit status
Where its permits stand, as the departments report them.
- Completed95
- Active53
- Closed2
- C/o issued2
- Stop work ordered2
- Approved1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.