Contractor · Plumbing
Street Plumbing Inc
156 building permits since 2020 in Minneapolis city, MN; Blaine city, MN and Coon Rapids city, MN, across 2 counties — $333,898 in reported job value over 1 permits that state one.
- Building permits
- 156
- Reported job value
- $333.9K
- Active
- 2020–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN120
- Blaine city, MN34
- Coon Rapids city, MN1
- Ramsey city, MN1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 12 |
| 2021 | 12 |
| 2022 | 16 |
| 2023 | 51 |
| 2024 | 23 |
| 2025 | 26 |
| 2026 (YTD) | 16 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing156
- Bathrooms75
- Kitchens38
- Water heaters29
- HVAC14
- Remodels13
- New construction10
- Electrical9
- Gas8
- Additions4
Permit types
As the building departments classify them.
- Plumbing121
- BLDG - Residential32
- BLDG - Commercial2
- ePermit - Residential Plumbing Remodel/Addition1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | Plumbing | Replace CPVC water lines throughout the house with PEX-A. Replace Bathtub with new metal tub. We do not install or replace tile to fill gaps left from replaceme | Minneapolis City | — |
| Sep 24, 2026 | Plumbing | New Construction Plumbing: Main level: Main bath:60x30 tub/shower -supplied by builder with tile walls , lav. toilet (ADA Gerber Maxwell). Kitchen sink on an ou | Minneapolis City | — |
| Aug 3, 2026 | Plumbing | Water lines and sewer to garage building. Run a sewer line from the front yard to the left of the house and stub up in the new garage getting built on the back | Minneapolis City | — |
| Jul 15, 2026 | Plumbing | Water heater was installed without a permit by someone else. Inspector asked for one to be pulled. We will bring up to code. | Minneapolis City | — |
| Jul 1, 2026 | Plumbing | new 2 story single family home | Minneapolis City | — |
| Jun 29, 2026 | Plumbing | New construction 3 level home and ADU garage w/living space above | Minneapolis City | — |
| Jun 10, 2026 | Plumbing | whole house remodel. upstairs bathroom. kitchen and basement | Minneapolis City | — |
| May 18, 2026 | Plumbing | 1st and 2nd floor remodel 2 bathrooms each floor and 2 kitchens | Minneapolis City | — |
Permit status
Where its permits stand, as the departments report them.
- Closed104
- Cancelled32
- Issued11
- Finaled6
- Expired3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.