Contractor · Electrical

PREMIER ELECTRIC 123 COMPANY

158 building permits since 2012 in Citrus County, FL; Crystal River city, FL and Hernando County, FL, across 3 counties — $72,950 in reported job value over 35 permits that state one.

Building permits
158
Reported job value
$73K
Active
2012–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus County, FL107
  • Crystal River city, FL48
  • Hernando County, FL2
  • Alachua County, FL1

Permits by year

By issue date (application date where there is none).

04080
64
20122015202020232026*
* 2026 is year to date.
View as table
YearPermits
20121
20133
20142
20152
20164
20171
20201
20211
20228
202313
202420
202538
2026 (YTD)64

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical155
  • Electric meters26
  • HVAC4
  • Generators4
  • Windows & doors4
  • Gas3
  • Remodels3
  • Solar2
  • Roofing2
  • Additions2

Permit types

As the building departments classify them.

  • Electrical108
  • Residential Electrical Express37
  • Com - Electrical3
  • ELECTRIC2
  • Self Issuance by Contractor - Electrical Change Out2
  • Solar2
  • Aluminum Structure1
  • Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026ElectricalINSTALL A 30 AMP / 240 VOLT CIRCUIT FROM HOUSE PANEL TO A PREWIRED MANUFACTURED SHED.Citrus County—
Oct 26, 2026ElectricalCOMM---REPLACE THE # 12 THHN IN EXSITING CONDUIT FOR WELL CIRCUIT AND THE TWO POLE 20 AMP BREAKER THAT WAS DAMAGED BY LIGHTNING STRIKE FROM EXSITING EXTERIOR PACitrus County—
Oct 19, 2026Residential Electrical ExpressCHANGE OUT PANEL SAME FOR SAME.Citrus County—
Oct 13, 2026Residential Electrical ExpressCHANGE OUT 200 AMP PANEL SAME FOR SAME.Citrus County—
Oct 13, 2026Residential Electrical ExpressCHANGE OUT PANEL SAME FOR SAME.Citrus County—
Sep 29, 2026Residential Electrical ExpressCHANGE OUT UTILITY POLE SAME FOR SAME.Citrus County—
Sep 23, 2026Residential Electrical ExpressCHANGE OUT 200 AMP EXTERIOR PANEL SAME FOR SAME.Citrus County—
Sep 21, 2026SolarInstallation of an 8-module, 2,560W DC rooftop photovoltaic addition to an existing 18-module, 5,760W DC solar array, bringing the total system to 26 Q.PEAK DUOCitrus County—

Permit status

Where its permits stand, as the departments report them.

  • Closed99
  • Finaled28
  • Issued11
  • Cancelled8
  • Expired7
  • Abandoned4
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.