Contractor · Electrical
William Black
10 building permits since 2019 in Gaston County, NC.
- Building permits
- 10
- Reported job value
- —
- Active
- 2019–2024
- Latest permit
- Jan 12, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gaston County, NC10
Permits by year
By issue date (application date where there is none).
048
8
201920202024
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 8 |
| 2020 | 1 |
| 2024 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Electric meters3
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Single Trade (Residential) - Electrical10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 12, 2024 | Single Trade (Residential) - Electrical | outdoor panel change service change | Gaston County | — |
| Jan 2, 2020 | Single Trade (Residential) - Electrical | changing out electrical panel, meter box to new | Gaston County | — |
| Nov 1, 2019 | Single Trade (Residential) - Electrical | changing out 2 panels indoor/outdoor | Gaston County | — |
| Aug 8, 2019 | Single Trade (Residential) - Electrical | Outdoor breaker box and meter box. | Gaston County | — |
| Jul 30, 2019 | Single Trade (Residential) - Electrical | fixed old circuit | Gaston County | — |
| Jul 30, 2019 | Single Trade (Residential) - Electrical | panel change | Gaston County | — |
| Jun 25, 2019 | Single Trade (Residential) - Electrical | 50 amp circut for hot tub | Gaston County | — |
| Apr 17, 2019 | Single Trade (Residential) - Electrical | outdoor panel and meter replacement | Gaston County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.