Contractor · Electrical

WEXLER MICHAEL CAREY

10 building permits since 2024 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2024–2026
Latest permit
Sep 8, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

02.55
5
202420252026*
* 2026 is year to date.
View as table
YearPermits
20245
20254
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar4
  • Battery storage4
  • Electrical4
  • Roofing3
  • Gas1
  • Grading & excavation1
  • Additions1
  • Plumbing1
  • Generators1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 8, 2026BuildingInstall a (30)kWh, (2) battery energy storage system and (200A) subpanel in conjunction with (E) PV and ESS systems on an existing SFD. Verify and/or install liSanta Cruz County—
Oct 15, 2025BuildingInstall a (30)kWh, (2) battery energy storage system and a (N) 50A inlet for a portable generator on an existing SFD. Verify and/or install listed smoke and carSanta Cruz County—
Jul 30, 2025BuildingConstruction Change Document #2 to Permit B-244701 to include the following: Page PV-1 & 2: Quantity of solar shingles has been changed from 176 to 150. QuantitSanta Cruz County—
May 16, 2025BuildingConstruction Change Document #1 to Permit B-244701 to include the following: Pages PV-1 to PV-5: Change from (92) to (172) Sunstyle solar roof shingle modules. Santa Cruz County—
Apr 23, 2025BuildingExtension to permit #B-226922; new expiration date is 11/14/2025Santa Cruz County—
Oct 8, 2024BuildingConstruction Change Document #1 to Permit B-226922 to include the landing and stairs to concrete, increase footprint to the deck and retaining wall and changes Santa Cruz County—
Sep 23, 2024BuildingConstruction Change Document #1 to Permit B-226921 to included change water heater from electric to propane.Santa Cruz County—
Aug 7, 2024BuildingInstall a roof mount (10.12)kW, (92) roof shingle modules, photovoltaic electrical system not to exceed 32 feet in height and a (27)kWh, (2) battery energy storSanta Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.