Contractor · Electrical
WATKINS FAMILY TRUST
10 building permits since 2018 in Santa Cruz County, CA.
- Building permits
- 10
- Reported job value
- —
- Active
- 2018–2026
- Latest permit
- Jan 5, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA10
Permits by year
By issue date (application date where there is none).
012
2
201820192020202120252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2019 | 2 |
| 2020 | 2 |
| 2021 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators3
- Gas2
- Accessory dwelling units1
- HVAC1
- Solar1
- Battery storage1
- Additions1
- Bathrooms1
- Demolition1
- Electrical1
Permit types
As the building departments classify them.
- Building10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 5, 2026 | Building | Construction of a (N) 951 SF swimming pool and a (N) 49 SF SPA with an automatic safety cover at existing SFD. Verify and/or install listed smoke and carbon mon | Santa Cruz County | — |
| Nov 18, 2025 | Building | Install a roof mount (22.08)kW, (48) modules photovoltaic electrical system not to exceed 32 feet in height and a (15)kWh, (2) battery energy storage system on | Santa Cruz County | — |
| May 25, 2021 | Building | Install a new 100kw backup generator with utility trenching to service (4) well locations and install a new 600A service panel at the existing barn, on site wit | Santa Cruz County | — |
| Jan 6, 2021 | Building | Change Order (Construction Change Documents) #1 to building permit B-201647 for the following; Generator size increase from 100Kw to 150kw. generator location a | Santa Cruz County | — |
| May 14, 2020 | Building | Change Order (Construction change Documents) # 2 to building permit B-182564 to include construction of approximately 117 square foot "safe" room at bottom stor | Santa Cruz County | — |
| May 14, 2020 | Building | Install 100kw LP Kohler generator with new dedicated propane tank and auto transfer switch to serve SFD. | Santa Cruz County | — |
| Nov 25, 2019 | Building | Construct a new 792 square foot 3-car garage on site with an existing SFD. Batch ran @ 4/22/2021 5:20:11 PM | Santa Cruz County | — |
| Jul 25, 2019 | Building | SRA-mod Change Order to B-182564 (replacement dwelling) to include master-bedroom window changes, revise entry door, revise exterior deck/porch railing design. | Santa Cruz County | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.