Contractor · Electrical

VELA ROBERT R & SANDY E

10 building permits since 2012 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2012–2020
Latest permit
Jan 27, 2020

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

012
2
2012201420182020
View as table
YearPermits
20122
20131
20141
20171
20181
20192
20202

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical4
  • Bathrooms3
  • HVAC2
  • Roofing2
  • Accessory dwelling units1
  • Plumbing1
  • Water heaters1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 27, 2020BuildingExtension to application B-181129, to extend until 7/27/2020Santa Cruz County—
Jan 23, 2020BuildingExtension to permit B-142610 to extend until 7/23/2020 Batch ran @ 1/29/2020 8:01:28 PMSanta Cruz County—
Nov 21, 2019BuildingTo extend building permit B-142610 until 1/23/20Santa Cruz County—
Mar 4, 2019BuildingRecognize an existing recently repaired approximate 625 square foot detached garage on site with a 1-story 2,012 square foot 3 bedroom 2 bath SFD, 720 square foSanta Cruz County—
Jul 25, 2018BuildingLRA Replace & upgrade to 200amps the main electrical service panel at an existing SFD. (40 Linden rd.) Install smoke & carbon monoxide alarms. Batch ran @ 8/6/2Santa Cruz County—
Feb 28, 2017BuildingLRA, Pajaro Fire Code violations NV23717 & NV 23796 ($160.00 due), Permit to rectify listed red tag violations Permit to recognize existing accessory structure Santa Cruz County—
Jun 9, 2014BuildingReplace electric service panel with new 200A service panel, FAU/ducts, water heater and underfloor insulation, all at an existing SFD. 11/17/2014 upgrade masterSanta Cruz County—
Dec 19, 2013BuildingEL: Install pump-up system for septic system at an existing single family dwelling.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed5
  • Active3
  • Pending payment1
  • Reviews complete1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.