Contractor · Specialty (solar, fire, telecom)

TWINPEAK SOLAR

10 building permits since 2022 in Sacramento city, CA; Contra Costa County, CA and Sacramento County, CA, across 4 counties — $307,063 in reported job value over 8 permits that state one.

Building permits
10
Reported job value
$307.1K
Active
2022–2026
Latest permit
Oct 9, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA4
  • Contra Costa County, CA1
  • Sacramento County, CA1
  • Danville town, CA1
  • Pittsburg city, CA1
  • Stockton city, CA1
  • Suisun City city, CA1

Permits by year

By issue date (application date where there is none).

036
6
202220252026*
* 2026 is year to date.
View as table
YearPermits
20222
20252
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar10
  • Plumbing4
  • Electrical4
  • Water heaters4
  • Battery storage2

Permit types

As the building departments classify them.

  • Single Family3
  • Electrical2
  • 01
  • MISR1
  • PVR1
  • Solar - Residential - Solar App Plus1
  • Solar System1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 9, 2026PVRInstallation of 10.12 Kw DC Solar System along with 20KWh Energy Storage system.Contra Costa County$45,489
Jul 14, 2026Single FamilyReviewed by SolarApp+ 5kw Solar PV System, 13.5 kw PV Storage System Size and nullgal Solar WH System (water heater installed null).Sacramento$23,962
Apr 6, 2026MISRInstallation of 11.285KW Solar System along with 13.5KWH of ESS; 238 233 inspections are required prior to setting panels.Sacramento County$32,163
Mar 9, 2026Solar - Residential - Solar App PlusROOF MOUNTED PV SYSTEM 6.02kW / ESS / 125A BACK UP LOADS CENTER **SOLARAPP+ PERMIT**Danville Town$25,605
Feb 5, 2026ElectricalE-permit: solar app application id - sa20260205-150-61-9902-a, residential - 9.89kw photovoltaic system main breaker replacement: - yes, battery backup units: -Stockton City—
Jan 20, 2026ElectricalSymbium-project_3834e7c5-e0b6-49af-8609-c2dca6471649:install 22 pv modules (9.9kw) with foxess co., ltd. Inverter; install 1 ess unit on an exterior wallPittsburg City—
Dec 9, 2025Solar SystemReviewed by SolarApp+ 25kw Solar PV System, 23 kw PV Storage System Size and nullgal Solar WH System (water heater installed null).Sacramento$72,828
Mar 28, 2025Single Family16.2kw Solar PV System, and 0gal Solar WH System (water heater installed null) W/ESS & MAIN BREAKER C/O. All supply side connections, main breaker change-out, aSacramento$53,776

Permit status

Where its permits stand, as the departments report them.

  • Issued7
  • Finaled3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.