Contractor · Electrical

TRANSMARINIS RE INVESTMENT LLC

10 building permits since 2023 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2023–2026
Latest permit
Jun 25, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

024
4
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20232
20241
20253
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical2
  • Solar1
  • Remodels1
  • Roofing1
  • Bathrooms1
  • Plumbing1
  • EV chargers1
  • Electric meters1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 25, 2026BuildingPermit extension granted to B-251675. New expiration date 12/25/2026.Santa Cruz County—
Apr 7, 2026BuildingConstruction Change Document #1 to Permit B-255502 to include following: Per PG&E requirements changed to a 6 Jaw meter panel with CT provisions. Revised specifSanta Cruz County—
Feb 5, 2026BuildingCABIN G: Plumbing permit to include replacing toilet, flange and vent and associated water lines at an existing structure. Verify and/or install listed smoke anSanta Cruz County—
Jan 28, 2026BuildingCABIN G Electrical permit includes new wiring/lights/switches, for renovations at an existing structure, 6 circuits. Verify and/or install listed smoke and carbSanta Cruz County—
Dec 18, 2025BuildingReplace electrical service panel with a (N) 400A service panel at an existing structures units C, D, F, G, H, I . Verify and/or install listed smoke and carbon Santa Cruz County—
Sep 8, 2025BuildingExtension #1 granted to permit B-242365 to 03/04/2026.Santa Cruz County—
Feb 10, 2025BuildingInstall pump-up system for septic system at an existing SFD. BL FPD / SRA-HIGH Permit extension granted to B-251675. New expiration date 12/25/2026.Santa Cruz County—
Mar 26, 2024BuildingReplace both hot-water and cold-water lines to unit F, G and C. Install listed smoke detectors and carbon monoxide alarms or combination smoke and carbon monoxiSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.