Contractor · General building
TIMOTHY GRAVES
10 building permits since 2021 in Buffalo city, NY — $1,408,500 in reported job value over 10 permits that state one.
- Building permits
- 10
- Reported job value
- $1.4M
- Active
- 2021–2025
- Latest permit
- Apr 25, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY10
Permits by year
By issue date (application date where there is none).
024
4
2021202220232025
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2022 | 3 |
| 2023 | 4 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels6
- Electrical3
- HVAC2
- Roofing2
- Plumbing2
- Demolition1
Permit types
As the building departments classify them.
- GC7
- INTBLDOUT1
- REPAIR1
- TEAROUT1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 25, 2025 | INTBLDOUT | Alteration and repair to the 10th floor of the Seneca One tower. A new tenant will be moving into the space with no change of use. New ceilings, walls will be a | Buffalo City | $100,000 |
| Jan 27, 2025 | REPAIR | Emergency roof repair for 367 Ellicott Street, Simon Electric Building. Roof collapsed. Torn off and will be rebuilt. *** DIGEPLAN *** *** POS. ASBESTOS S | Buffalo City | $50,000 |
| Sep 6, 2023 | GC | ( 1 SENECA / SENECA TOWER ) ALTER EXISTING RETAIL SPACE FOR ( ANIMAL CARE ESTABLISHMENT ) USE IN THE ( N-1D ) ZONE. INTERIOR TENANT BUILD-OUT OF SP | Buffalo City | $10,000 |
| Apr 26, 2023 | GC | ***1500 CLINTON**** TO AN EXISTING 2 STORY MASONRY BUILDING INTERIOR BUILD OUT FOR OFFICE. REMOVAL OF STAIR AND CANOPY ON NORTHEAST AND REPLACE WITH NEW STAIR A | Buffalo City | $250,000 |
| Mar 9, 2023 | TEAROUT | ( 1500 CLINTON AKA BLDG 7 THE SAUSAGE MAKER STORE ) TEAR OUT ON THE 1ST AND 2ND FLOOR AND REMOVAL OF CANOPY COVER AND CONCRETE/STEEL DO | Buffalo City | $2,500 |
| Feb 3, 2023 | GC | Interior build-out to convert a portion of 1 Seneca Tower (Building 2 ) to a Tavern for " Other Half Brewing " in a N-1D zone. *** ALL PLUMBING, ELECTRICAL & | Buffalo City | $800,000 |
| Sep 13, 2022 | GC | Tear out of existing roof & structural trusses. Repairs to roof, walls and trusses. *** ATTACHED GARAGE DEMO FILED UNDER PERMIT # REP22 - 9544776 ***<div><b | Buffalo City | $50,000 |
| Mar 29, 2022 | GC | INTERIOR TENANT BUILDOUT ON THE 1ST FLOOR FOR (2) SEPARATE TENANT SPACES - " BUFFALO REHAB GROUP " (SUITE #1) AND " SWEAT SOCIETY GYM " | Buffalo City | $115,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.