Contractor · Electrical
TESLA ELECTRIC CO
10 building permits since 2017 in Tigard city, OR.
- Building permits
- 10
- Reported job value
- —
- Active
- 2017–2026
- Latest permit
- Oct 5, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tigard city, OR10
Permits by year
By issue date (application date where there is none).
01.53
3
2017202020242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2019 | 2 |
| 2020 | 1 |
| 2022 | 1 |
| 2024 | 1 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Kitchens2
- Bathrooms2
- EV chargers2
- HVAC1
- Electric meters1
- New construction1
Permit types
As the building departments classify them.
- Residential Electrical10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 5, 2026 | Residential Electrical | 200amp panel swap, new kitchen, bathrooms, lights, EV plug, hvac circuits | Tigard | — |
| May 27, 2025 | Residential Electrical | Varga - Adding (5) branch circuits. Work by Owner | Tigard | — |
| May 23, 2025 | Residential Electrical | Wilhite - 400 amp service upgrade and (10) branch ciruits for additional garage and room above. | Tigard | — |
| Mar 17, 2025 | Residential Electrical | Basement - basement wiring, sump pump circuits, rewire upstairs outlets, replace bath fans, run data cable | Tigard | — |
| Dec 26, 2024 | Residential Electrical | Shed - 20amp underground circuit for new shed, outlets and lights, | Tigard | — |
| Jan 25, 2022 | Residential Electrical | Panel swap - Replaced existing 150A electrical panel, install 4" LED LIGHTS IN KITCHEN, CEILING FAN IN MASTER BEDROOM | Tigard | — |
| Mar 4, 2020 | Residential Electrical | Julie - Install new 200amp meter maim and run feeder to existing panel, replace knob and tube in attic | Tigard | — |
| Apr 24, 2019 | Residential Electrical | Price - 150amp panel change, 30amp outlet fro EV car | Tigard | — |
Permit status
Where its permits stand, as the departments report them.
- Closed5
- Expired4
- Issued1
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.