Contractor · Specialty (solar, fire, telecom)

SUNNY SOLAR POWER

10 building permits since 2020 in San Diego County, CA; San Diego city, CA and Oceanside city, CA, across 2 counties.

Building permits
10
Reported job value
—
Active
2020–2026
Latest permit
Mar 10, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA6
  • San Diego city, CA2
  • Oceanside city, CA1
  • Temecula city, CA1

Permits by year

By issue date (application date where there is none).

024
4
20202022202320242026*
* 2026 is year to date.
View as table
YearPermits
20201
20222
20234
20241
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar7
  • Electrical4
  • Battery storage1
  • Roofing1

Permit types

As the building departments classify them.

  • Electrical2
  • BLDG - Building (R)1
  • SFD SOLAR PV - SIMPLE1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 10, 2026Electrical—San Diego City—
Jan 12, 2026Electrical—San Diego City—
Jul 8, 2024BLDG - Building (R)Online / Roof mounted PV 7.38kW with 10kWH ESS / 18 panels / 18 micro-inverters / 2 batteries / Gigliotti residenceTemecula City—
Jul 13, 2023—Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit) *The scope of work is limited to upgrade of the existing main service panel. No neSan Diego County—
May 9, 2023—(Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH NEW 100A BREAKER 200A BUSS MAIN SERVICE PANEL UPGRADE (MISC. ELEC.). This Permit does not San Diego County—
May 4, 2023SFD SOLAR PV - SIMPLERoof PV, 4 modules, existing Inverter, 1.6 KWOceanside City—
Feb 3, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Feb 28, 2022—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Issued4
  • Active3
  • Finaled3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.