Contractor · Electrical
Sophia Frey
10 building permits since 2023 in Mesa city, AZ — $92,450 in reported job value over 10 permits that state one.
- Building permits
- 10
- Reported job value
- $92.5K
- Active
- 2023–2026
- Latest permit
- Oct 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ10
Permits by year
By issue date (application date where there is none).
048
8
202320252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Solar9
- Electric meters9
- Battery storage7
Permit types
As the building departments classify them.
- Electrical10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 8, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE FRANKLIN APOWER 2 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $20,000 |
| Oct 1, 2026 | Electrical | PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE SOLAREDGE BATTERY-10K. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK T | Mesa | $6,000 |
| Sep 9, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF FOUR SOLAREDGE NEXIS BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVIC | Mesa | $1,500 |
| Jul 2, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $18,500 |
| Jul 2, 2026 | Electrical | Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO | Mesa | $2,750 |
| Jun 30, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $10,000 |
| Jun 16, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $10,000 |
| Apr 21, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued8
- Issued2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.