Contractor · Electrical

Sophia Frey

10 building permits since 2023 in Mesa city, AZ — $92,450 in reported job value over 10 permits that state one.

Building permits
10
Reported job value
$92.5K
Active
2023–2026
Latest permit
Oct 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ10

Permits by year

By issue date (application date where there is none).

048
8
202320252026*
* 2026 is year to date.
View as table
YearPermits
20231
20251
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10
  • Solar9
  • Electric meters9
  • Battery storage7

Permit types

As the building departments classify them.

  • Electrical10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 8, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE FRANKLIN APOWER 2 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICEMesa$20,000
Oct 1, 2026ElectricalPERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE SOLAREDGE BATTERY-10K. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TMesa$6,000
Sep 9, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF FOUR SOLAREDGE NEXIS BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICMesa$1,500
Jul 2, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$18,500
Jul 2, 2026ElectricalResidential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DOMesa$2,750
Jun 30, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$10,000
Jun 16, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$10,000
Apr 21, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$20,000

Permit status

Where its permits stand, as the departments report them.

  • C/o issued8
  • Issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.