Contractor · Electrical

SINGH HARLIV

10 building permits since 2018 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2018–2026
Latest permit
Oct 5, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

01.53
3
2018202020242026*
* 2026 is year to date.
View as table
YearPermits
20182
20193
20201
20211
20241
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical3
  • HVAC2
  • Heat pumps2
  • Solar1
  • Battery storage1
  • Roofing1
  • Additions1
  • Demolition1
  • Electric meters1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 5, 2026BuildingConstruction Change Document #1 to Permit B-235949to include the following: R eplacement of the failing retaining wall discovered during construction, and relatSanta Cruz County—
Dec 18, 2025BuildingExtension #1 B-256837 granted to B-235949 until 6/11/26. TG 12/11/25Santa Cruz County—
Dec 11, 2024BuildingDemo and replace existing 850 SF deck with a new 1700 SF deck at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combination smokeSanta Cruz County—
Feb 11, 2021BuildingConstruction change document #1 to B-204018, to include SLD on sheet E7 has been updated as per the in-field corrections, also on sheet E1 has been updated for Santa Cruz County—
Nov 3, 2020BuildingSRA-Mod/Santa Cruz Go on line and check the status of your application, correction and approval letters will not be mailed. Install (4) "Tesla" 13.5kwh each EneSanta Cruz County—
Aug 22, 2019BuildingICounty - MOD nstall new heat pump condenser & install new outdoor GFCI on site at an existing SFD. Install listed smoke detectors and carbon monoxide alarms orSanta Cruz County—
Jan 28, 2019BuildingChange Order (Construction Change Documents) #1 to building permit B-185185 to include increasing to 12.650kw & increasing to 46 modules. Batch ran @ 4/22/2021 Santa Cruz County—
Jan 4, 2019BuildingInstall a roof mount 9.9kw, 36 module photovoltaic electrical system not to exceed 32 feet in height on an SFD. The Building Inspector may require roof structurSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Active1
  • Reviews complete1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.