Contractor · Electrical

Shawn French

10 building permits since 2022 in New Fairfield town, CT; Glastonbury town, CT and Stamford town, CT, across 3 counties — $393,245 in reported job value over 10 permits that state one.

Building permits
10
Reported job value
$393.2K
Active
2022–2026
Latest permit
Aug 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • New Fairfield town, CT3
  • Glastonbury town, CT2
  • Stamford town, CT2
  • Enfield town, CT1
  • Branford town, CT1
  • New Milford town, CT1

Permits by year

By issue date (application date where there is none).

024
4
202220252026*
* 2026 is year to date.
View as table
YearPermits
20223
20254
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical9
  • Solar3
  • Electric meters3
  • HVAC2
  • Roofing1
  • Generators1
  • Demolition1

Permit types

As the building departments classify them.

  • Electrical Permit5
  • Electrical Permit Application2
  • Electrical Permit General2
  • Solar Permit Application1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 28, 2026Electrical Permit• Make-Safe/Cut & Drop Demolition (removal & disposal by Others). • Temporary lighting, and subsequent maintenance, and power stations as required. • PenetratioStamford Town$208,904
Apr 12, 2026Electrical Permit GeneralRelocate 400a underground service from basement to exterior wall. 1. Install new 400a meter socket. 2. Run new SER from meter to existing main service panels. 3Glastonbury Town$15,143
Apr 10, 2026Electrical Permit GeneralReplace existing overhead service with a new 600a 480V underground service. Includes new disconnect, CT cabinet, Meter, and panelboard. Includes a new pad mountGlastonbury Town$93,500
Dec 11, 2025Electrical PermitElectrical disconnect and reconnect of one existing AHU unit.Stamford Town$31,378
Oct 23, 2025Electrical PermitElectrical Power for Canning Line Required new circuit breakers will be installed in panel HV-3 on the second floor. New EMT conduits will penetrate the adjacenBranford Town$16,350
Oct 14, 2025Electrical PermitThis is to address the failed inspection certificate on existing permit #PV-24-7. The service was replaced without a permit. This permit application is intendedEnfield Town$3,500
Jul 26, 2025Solar Permit ApplicationThe removal and re installation of an existing 20 panel PV Solar system. The roof is being re done and requires the solar to be removed prior to and re installaNew Fairfield Town$5,520
Oct 27, 2022Electrical Permit ApplicationReplacement of existing 200a main service panel with a new 200a 40 space panel.New Fairfield Town$1,600

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Active3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.