Contractor · General building

RUBIN MARK J

10 building permits since 2016 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2016–2024
Latest permit
Aug 1, 2024

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

01.53
3
201620202021202220232024
View as table
YearPermits
20161
20203
20212
20221
20232
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Windows & doors5
  • Remodels4
  • Electrical4
  • Bathrooms3
  • Plumbing3
  • Solar2
  • Kitchens2
  • HVAC1
  • Battery storage1
  • Additions1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 1, 2024BuildingInterior remodel of primary bathroom to resize shower enclosure, reframe and add pocket door update cabinets, plumbing electrical at existing SFD. Install listeSanta Cruz County—
May 8, 2023BuildingReplace-in-kind 3 windows in the bathroom at an existing SFD. No structural alterations/changes permitted. Bedroom windows need 5.7 sq ft minimum net clear openSanta Cruz County—
Mar 28, 2023BuildingBoulder Creek FPD/SRA Mod Replace-in-kind (4) window, (1) with dual pane glass door, bedroom windows need 5.7 sq ft minimum net clear opening at an existing SFDSanta Cruz County—
Aug 18, 2022BuildingConstruction change document #2 to B-195542, to Include Window and Door Schedule Changes in the mudroom.Santa Cruz County—
Aug 23, 2021BuildingConstruction change document #1 to B-195542, to Include adding the Sunroom, laundry and power room to the kitchen and dining remodel, replace plumbing fixtures Santa Cruz County—
Jul 12, 2021BuildingExtension to B-195542, to extend until 1/28/2022 Batch ran @ 5/12/2022 4:48:05 PMSanta Cruz County—
Dec 11, 2020BuildingConstruction Change Documents - Change Order #1 to B-204211 SPV to include changes to location of equipment and updated placards.Santa Cruz County—
Oct 26, 2020BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount (12.24)kW, (36) modules photovoltaSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.