Contractor · Electrical
Robert Sibya JR
10 building permits since 2023 in Acton town, MA; Rutland town, MA and Southborough town, MA, across 2 counties — $23,700 in reported job value over 8 permits that state one.
- Building permits
- 10
- Reported job value
- $23.7K
- Active
- 2023–2026
- Latest permit
- Aug 17, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Acton town, MA2
- Rutland town, MA2
- Southborough town, MA2
- Arlington town, MA1
- Hudson town, MA1
- Lexington town, MA1
- Clinton town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 1 |
| 2024 | 3 |
| 2025 | 2 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Windows & doors2
- Kitchens1
- Plumbing1
- Generators1
- Water heaters1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical Permit6
- Electrical Permit Application3
- Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 17, 2026 | Electrical Permit Application | Change outside of service plus feeder into building from meter socket. Drove ground rods and seperate all grounds and neutrals. | Clinton Town | $3,500 |
| Jun 3, 2026 | Electrical Permit Application | No | Arlington Town | $4,500 |
| Feb 25, 2026 | Electrical Permit | Run 20A dedicated circuit to front of building outside left of front door left window. Cut in outlet location, with a new switch location cut in at kitchen exte | Acton Town | $1,500 |
| Feb 25, 2026 | Electrical Permit | Run a dedicated 20a circuit to a new outlet located left of front door. Install a switch next to main electric panel to control said outlet. Install GFI protect | Acton Town | $1,500 |
| Aug 11, 2025 | Electrical Permit | Install a 100a subpanel and move several circuits from main panel to subpanel as it was over loaded. | Southborough Town | — |
| Feb 26, 2025 | Electrical Permit | Run new circuit for an electric hot water heater 40GAL, Install a 50A generac load management relay in series of the new hot water tank | Southborough Town | — |
| Sep 24, 2024 | Electrical | No | Lexington Town | $1,500 |
| Jun 5, 2024 | Electrical Permit | — | Rutland Town | $1,500 |
Permit status
Where its permits stand, as the departments report them.
- Active5
- Completed5
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.