Contractor · Electrical

Robert Sibya JR

10 building permits since 2023 in Acton town, MA; Rutland town, MA and Southborough town, MA, across 2 counties — $23,700 in reported job value over 8 permits that state one.

Building permits
10
Reported job value
$23.7K
Active
2023–2026
Latest permit
Aug 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Acton town, MA2
  • Rutland town, MA2
  • Southborough town, MA2
  • Arlington town, MA1
  • Hudson town, MA1
  • Lexington town, MA1
  • Clinton town, MA1

Permits by year

By issue date (application date where there is none).

024
4
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20231
20243
20252
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10
  • Windows & doors2
  • Kitchens1
  • Plumbing1
  • Generators1
  • Water heaters1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical Permit6
  • Electrical Permit Application3
  • Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 17, 2026Electrical Permit ApplicationChange outside of service plus feeder into building from meter socket. Drove ground rods and seperate all grounds and neutrals.Clinton Town$3,500
Jun 3, 2026Electrical Permit ApplicationNoArlington Town$4,500
Feb 25, 2026Electrical PermitRun 20A dedicated circuit to front of building outside left of front door left window. Cut in outlet location, with a new switch location cut in at kitchen exteActon Town$1,500
Feb 25, 2026Electrical PermitRun a dedicated 20a circuit to a new outlet located left of front door. Install a switch next to main electric panel to control said outlet. Install GFI protectActon Town$1,500
Aug 11, 2025Electrical PermitInstall a 100a subpanel and move several circuits from main panel to subpanel as it was over loaded.Southborough Town—
Feb 26, 2025Electrical PermitRun new circuit for an electric hot water heater 40GAL, Install a 50A generac load management relay in series of the new hot water tankSouthborough Town—
Sep 24, 2024ElectricalNoLexington Town$1,500
Jun 5, 2024Electrical Permit—Rutland Town$1,500

Permit status

Where its permits stand, as the departments report them.

  • Active5
  • Completed5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.