Contractor · Plumbing
RICHARD RIGGINS
10 building permits since 2022 in Salem city, OR and Tigard city, OR, across 2 counties.
- Building permits
- 10
- Reported job value
- —
- Active
- 2022–2026
- Latest permit
- Aug 7, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Salem city, OR6
- Tigard city, OR4
Permits by year
By issue date (application date where there is none).
01.53
3
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 3 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing10
- Remodels6
- Gas1
- HVAC1
- Bathrooms1
- Water heaters1
Permit types
As the building departments classify them.
- Plumbing Permit - Residential - Alteration4
- Residential Plumbing - Additional Fixtures Being Added3
- Plumbing Permit - Commercial - Alteration2
- Residential Mechanical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 7, 2026 | Plumbing Permit - Residential - Alteration | MAIN LINE ACCESS AND INSTALL CLEAN OUT | Salem City | — |
| Mar 5, 2026 | Plumbing Permit - Residential - Alteration | Replace water service from meter to the home {1 100 foot water service} | Salem City | — |
| Oct 29, 2025 | Plumbing Permit - Residential - Alteration | outdoor rain drain drywell and 50 feet of new underground rain drain piping into the new drywell. | Salem City | — |
| Oct 16, 2025 | Plumbing Permit - Residential - Alteration | 1-60ft sanitary sewer (Replacing 60 feet of private sanitary sewer from cleanout at outside side of home, through front yard and to the legal right of way at fr | Salem City | — |
| Jan 17, 2025 | Plumbing Permit - Commercial - Alteration | Commercial Tenant Improvement. 

Adding the following fixtures to the existing space: 

TOILETS - (8)
URINALS - (2) | Salem City | — |
| Jun 11, 2024 | Plumbing Permit - Commercial - Alteration | Install new Watts 1" double check valve above ground w/hot box. 
1 - Backflow Device | Salem City | — |
| Mar 8, 2023 | Residential Plumbing - Additional Fixtures Being Added | Daterman - Hot and Cold re-pipe, 2 floors. Replace water service from meter to crawlspace, approximately 60ft. | Tigard | — |
| Dec 20, 2022 | Residential Plumbing - Additional Fixtures Being Added | Sy - 138472 - Replace existing water service with 1 1/2” wirsbo piping, connecting to the irrigation outside of home to resolve leakage. Approximately 50 feet. | Tigard | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled5
- Closed3
- Issued1
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.