Contractor · Specialty (solar, fire, telecom)
RAYKER INC DBA GREENSPIRE CONSTRUCTION
10 building permits since 2020 in Redlands city, CA and San Diego County, CA, across 2 counties.
- Building permits
- 10
- Reported job value
- —
- Active
- 2020–2023
- Latest permit
- Apr 12, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Redlands city, CA8
- San Diego County, CA2
Permits by year
By issue date (application date where there is none).
048
8
202020212023
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2021 | 8 |
| 2023 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar10
- Electrical6
Permit types
As the building departments classify them.
- B-BSP Solar8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 12, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance wit | San Diego County | — |
| Dec 6, 2021 | B-BSP Solar | RESIDENTIAL: PV SOLAR 5.76 KW SOLAR SYSTEM 16 PANELS NEW 200 APM PANEL UPGRADE | Redlands City | — |
| Oct 28, 2021 | B-BSP Solar | RESIDENTIAL: (N) 5.76kwdc PV SOLAR (ROOF MOUNTED), (16) MODULES, (N) 200A MAIN PANEL UPGRADE | Redlands City | — |
| Oct 27, 2021 | B-BSP Solar | RESIDENTIAL: (N) 5.76kwdc PV SOLAR (ROOF MOUNTED), (16) MODULES | Redlands City | — |
| Sep 28, 2021 | B-BSP Solar | RESIDENTIAL: (N) 10.295kwdc PV SOLAR (ROOF MOUNTED), (29) MODULES* (N) 225A MAIN PANEL UPGRADE W/ 200A MAIN BREAKER | Redlands City | — |
| Aug 31, 2021 | — | ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT) *The scope of work is limite | San Diego County | — |
| Aug 30, 2021 | B-BSP Solar | RESIDENTIAL: INSTALL (11) ROOFTOP PHOTOVOLTAIC (3.905 KW). | Redlands City | — |
| Aug 19, 2021 | B-BSP Solar | RESIDENTIAL: (N) 6.745kwdc PV SOLAR (ROOF MOUNTED), (19) MODULES* (N) 200A MAIN PANEL UPGRADE | Redlands City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled5
- Issued4
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.