Contractor · Electrical
PLUM ELECTRICAL
10 building permits since 2018 in Marin County, CA and Sonoma County, CA, across 2 counties — $16,850 in reported job value over 7 permits that state one.
- Building permits
- 10
- Reported job value
- $16.9K
- Active
- 2018–2026
- Latest permit
- Mar 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marin County, CA7
- Sonoma County, CA3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 1 |
| 2020 | 1 |
| 2021 | 1 |
| 2023 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical9
- Generators1
- Electric meters1
- New construction1
Permit types
As the building departments classify them.
- RESIDENTIAL6
- Electrical3
- COMMERCIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 29, 2026 | Electrical | Replace 200a overhead fed zinsco electric meter panel with new, refeed existing loads, no added load. Sfd | Sonoma County | — |
| Mar 13, 2026 | Electrical | Install new 100a 3 phase 120/240v underground fed electric service for 7.5 hp well pump feeding vineyard. | Sonoma County | — |
| Jan 14, 2026 | Electrical | Replace 100a oh fed electric service panel with new 200a main, relocate to north wall, refeed existing circuits, install grounding, bonds and surge protector. S | Sonoma County | — |
| Sep 18, 2025 | RESIDENTIAL | Install 1-250v 20a and 1-120v 15a circuit from existing subpanel in laundry room to new Orenco septic control panel. Wire septic pump, controls and remote alarm | Marin County | $2,450 |
| Aug 16, 2023 | COMMERCIAL | Install 30a 250v circuit from generator backed up panel to new duplex septic system with 2- P50 1/2 HP septic pumps, controls and alarm. 400' underground condui | Marin County | $7,500 |
| Apr 27, 2023 | RESIDENTIAL | Install 2-250v 20a and 1-120v 15a circuits to septic control panel. Install remote alarm in residence for septic system. | Marin County | $1,200 |
| Sep 20, 2021 | RESIDENTIAL | Electrical branch circuits for septic system pumps and control panel. | Marin County | $1,200 |
| Nov 18, 2020 | RESIDENTIAL | Install 2 new circuits to septic control panel and wire pump and float switches. | Marin County | $1,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated7
- Finaled2
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.