Contractor · Electrical
PATRICK T MEENAN
10 building permits since 2021 in Greenwich town, CT — $13,750 in reported job value over 2 permits that state one.
- Building permits
- 10
- Reported job value
- $13.8K
- Active
- 2021–2026
- Latest permit
- Jun 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT10
Permits by year
By issue date (application date where there is none).
02.55
5
20212022202320242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2022 | 5 |
| 2023 | 1 |
| 2024 | 1 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical8
- Kitchens4
- Bathrooms4
- Electric meters3
- HVAC2
- Generators2
- Pools & hot tubs2
Permit types
As the building departments classify them.
- ELE8
- GEN1
- PLU1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 2, 2026 | ELE | 1 smoke alarm, 46 recessed light, 35 outlets, 18 swtchs.; wire basement, 1 floor heat. 18 swtchs., 35 outlets, 46 fixtures (99 total devices). Existing meter (1 | Greenwich Town | — |
| Mar 13, 2026 | ELE | smoke and carbons; move a panel; rewire bathroom, kitchen. Add recessed light inside each room. Moving - adding laundry power, 120 volt. 40 swtchs., 35 outlets, | Greenwich Town | — |
| Jul 30, 2024 | ELE | 400 amp. service; 4 meters, 3-family. 6 panels, 160 swtchs., 190 lights, 220 outlets (approx), 3 kitchen, 12 bathrooms, central air and heat. 160 swtchs., 220 o | Greenwich Town | — |
| Sep 8, 2023 | ELE | Wire the pool house: line and low voltage. Subpanel run from pool panel. 12 swtchs., 155 outlets, 20 lt fixtures (47 total devices). Amendment (9/26/23): Grill | Greenwich Town | — |
| Dec 7, 2022 | ELE | Existing 400 amp. service. Underground pipe from house to pool | Greenwich Town | — |
| Oct 3, 2022 | ELE | 200 amp. service upgrade, 2 bathrooms, kitchen, closet and family room, outside lights, low voltage; 20 swtchs., 18 outlets, 28 lt fixtures (66 total devices); | Greenwich Town | — |
| Jun 27, 2022 | PLU | gasline to generator | Greenwich Town | $1,750 |
| Jun 9, 2022 | GEN | 24 kw Generator in back yard; transfer swtch. PLU: gasline to generator | Greenwich Town | $12,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed6
- Active4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.