Contractor · Plumbing

NOTTURNO MICHAEL

10 building permits since 2012 in Walpole town, MA and Middleborough town, MA, across 2 counties.

Building permits
10
Reported job value
—
Active
2012–2018
Latest permit
Dec 18, 2018

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Walpole town, MA9
  • Middleborough town, MA1

Permits by year

By issue date (application date where there is none).

036
6
2012201320152018
View as table
YearPermits
20126
20132
20151
20181

Type of work

Permits describing each kind of work; one permit can cover several.

  • Gas6
  • Plumbing6
  • New construction4
  • Generators1

Permit types

As the building departments classify them.

  • Gas Permit Residential One and Two Family5
  • Plumbing Permit Residential One and Two Family4
  • Gas Fitting Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 18, 2018Gas Fitting Permit—Middleborough Town—
Jan 8, 2015Plumbing Permit Residential One and Two FamilyREPLACE VAINTYWalpole Town—
Sep 10, 2013Gas Permit Residential One and Two FamilyINSTALL A 1' GAS LINE FROM THE GAS METER OVER 8' TO A NEW GAS GENERATOR. ON THE LEFT HAND SIDE OF THE THE HOUSE OUTSIDE.Walpole Town—
Jun 18, 2013Gas Permit Residential One and Two FamilyRELOCATING 1/2 GAS GRILL GAS LINE FROM ONE SIDE OF EXISTING DECK TO THE OPPOSITE SIDE.Walpole Town—
Oct 2, 2012Gas Permit Residential One and Two FamilyINSTALLATION OF A GAS FIREPLACEWalpole Town—
Oct 2, 2012Plumbing Permit Residential One and Two FamilyINSTALLATION OF A SECOND METERWalpole Town—
Sep 5, 2012Gas Permit Residential One and Two FamilyINSTALLATION OF GAS FIXTURES FOR NEW HOMEWalpole Town—
Sep 5, 2012Plumbing Permit Residential One and Two FamilyINSTALLATION OF PLUMBING FIXTURES FOR NEW HOMEWalpole Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Active1
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.