Contractor · Electrical
Nicole Tedeyan
10 building permits since 2024 in Ithaca town, NY; Lansing town, NY and Ithaca city, NY — $687,916 in reported job value over 10 permits that state one.
- Building permits
- 10
- Reported job value
- $687.9K
- Active
- 2024–2025
- Latest permit
- Nov 13, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Ithaca town, NY6
- Lansing town, NY3
- Ithaca city, NY1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 4 |
| 2025 | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar10
- Battery storage5
- Electrical3
- Additions2
- Accessory dwelling units1
- HVAC1
- Roofing1
- Generators1
- Electric meters1
- New construction1
Permit types
As the building departments classify them.
- TOI - Solar Permit Application4
- New York State Uniform Solar Permit3
- TOI - Electrical Permit Application2
- Building Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 13, 2025 | TOI - Solar Permit Application | Installation of 13.485 kW roof-mounted solar photovoltaic system with microinverters. In addition, replace the existing main electrical service panel with a new | Ithaca Town | $34,212 |
| Oct 30, 2025 | New York State Uniform Solar Permit | Install 30 solar modules on south house and east garage roof faces (13.05 kW DC). Install 25.6 kWh energy storage system (battery backup) in basement of house, | Lansing Town | $44,938 |
| Oct 16, 2025 | TOI - Solar Permit Application | Remove existing 14 roof-mounted solar panels and racking from the detached garage/ADU. Install a new 9.2 kW (DC) PV system with 20 × 460 W modules—8 panels serv | Ithaca Town | $20,812 |
| Mar 18, 2025 | New York State Uniform Solar Permit | Installation of 5.52 kW roof-mounted solar PV system, direct grid-tie without battery backup. | Lansing Town | $17,620 |
| Mar 4, 2025 | TOI - Electrical Permit Application | There is a new underground 800A service to the building. We had the electrical contractor for the project install a 400A meter conected into the CT cabinet. The | Ithaca Town | $169,389 |
| Mar 3, 2025 | TOI - Solar Permit Application | Install 72.8 kW roof-mounted solar PV array consisting of 140 Silfab modules onto sloped, southeast roof of newly-constructed building expansion. In addition, i | Ithaca Town | $169,389 |
| Jul 31, 2024 | New York State Uniform Solar Permit | Installation of 31.5 kW (DC) roof-mounted solar photovoltaic system with Enphase Sunlight Backup | Lansing Town | $79,721 |
| Jul 23, 2024 | TOI - Solar Permit Application | Install 25.2 kW Roof-Mounted Solar PV System with 60 solar modules attached to upper house & main house’s front roof and attached garage’s front roof, NYSEG # 1 | Ithaca Town | $63,563 |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Active2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.