Contractor · Electrical
MOAYEDIAN ALI
10 building permits since 2019 in Santa Cruz County, CA.
- Building permits
- 10
- Reported job value
- —
- Active
- 2019–2023
- Latest permit
- Apr 28, 2023
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA10
Permits by year
By issue date (application date where there is none).
024
4
20192020202120222023
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 2 |
| 2022 | 1 |
| 2023 | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical5
- Solar3
- Battery storage2
- Additions1
Permit types
As the building departments classify them.
- Building10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 28, 2023 | Building | Construction Change Document #1 to Permit B-223860 to include reconfiguration and relocation of equipment and the addition of a subpanel. Main breaker enclosure | Santa Cruz County | — |
| Apr 20, 2023 | Building | 6 month extension to issued building permit B-232874 1/27/2024 | Santa Cruz County | — |
| Jan 17, 2023 | Building | Replace electrical service panel with a new <400A service panel at an existing structure. Install listed smoke detectors and carbon monoxide alarms or combinati | Santa Cruz County | — |
| Jan 17, 2023 | Building | Electrical permit includes less than 5 circuits at existing structures. Install listed smoke detectors and carbon monoxide alarms or combination smoke and carbo | Santa Cruz County | — |
| Jul 26, 2022 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount (12)kW, (30) modules photovoltaic | Santa Cruz County | — |
| Aug 10, 2021 | Building | Original application B-194401 was submitted as paper plans. Construction Change Document #3 to B-194401 to include new scope of work to be installation of a roo | Santa Cruz County | — |
| Aug 3, 2021 | Building | 6 month extension to Building permit B-194401. | Santa Cruz County | — |
| Mar 10, 2020 | Building | Change Order (Construction Change Documents) # 2 to building permit B-194401 to include installation of 1 power walls. | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Not stated2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.