Contractor · General building
Matthew Laracy
10 building permits since 2022 in Sharon town, MA; Easton town, MA and Attleboro city, MA, across 2 counties — $201,260 in reported job value over 7 permits that state one.
- Building permits
- 10
- Reported job value
- $201.3K
- Active
- 2022–2026
- Latest permit
- Aug 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sharon town, MA4
- Easton town, MA2
- Attleboro city, MA1
- North Attleborough Town city, MA1
- Foxborough town, MA1
- Walpole town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 2 |
| 2023 | 2 |
| 2024 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels6
- Demolition5
- Bathrooms4
- Pools & hot tubs4
- Plumbing2
- Electrical2
- Kitchens1
Permit types
As the building departments classify them.
- Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)4
- RESI.3
- Building Permit1
- Building Permit-All One and Two Family1
- COMM.1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 27, 2026 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Kitchen Remodel: new cabinets, flooring, backsplash, etc | Sharon Town | $75,000 |
| Apr 23, 2026 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Add additonal stair case to existing rear deck. | Sharon Town | $4,350 |
| Mar 31, 2026 | Building Permit-All One and Two Family | Remodel first floor full bathroom. Install new shower stall, vanity, flooring, and trim. Add a linen closet. Selective demolition, not a full gut. No structural | Walpole Town | $23,000 |
| Jan 21, 2026 | Building Permit | Basement Full Bathroom Remodel: Demo and rebuild exisiting bathroom. Same footprint and layout. | North Attleborough Town City | $19,410 |
| Sep 24, 2025 | RESI. | — | Attleboro City | — |
| Aug 2, 2024 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Convert existing laundry room on first floor to a half-bathroom. Minimal demolition of one wall (non-load bearing), and rebuilding to make room slightly smaller | Sharon Town | $47,500 |
| Jul 18, 2023 | COMM. | Demolish and rebuild existing stairs off the rear porch of the residence. Porch will not be modified, only set of stairs will be rebuilt. | Foxborough Town | $12,000 |
| May 4, 2023 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Full 2nd floor bathroom remodel. Demolition to studs of current bathroom. Layout of bathroom not being changed. Update plumbing and electrical to code. Evaluate | Sharon Town | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Active1
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.