Contractor · Specialty (solar, fire, telecom)
Madison Keller
10 building permits since 2024 in Greene County, NC; Lenoir County, NC and Davie County, NC, across 3 counties — $155,266 in reported job value over 3 permits that state one.
- Building permits
- 10
- Reported job value
- $155.3K
- Active
- 2024–2025
- Latest permit
- Dec 12, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greene County, NC4
- Lenoir County, NC4
- Davie County, NC2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 5 |
| 2025 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar8
- Electrical5
- Battery storage1
- Electric meters1
Permit types
As the building departments classify them.
- Electric Permit Application3
- Electrical Permit Application2
- *Residential Solar Installation Permit2
- Solar Installation Permit2
- Residential Building Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 12, 2025 | *Residential Solar Installation Permit | 24 roof mounted solar photovoltaic modules on existing residence with a 1 10kwh battery. | Davie County | $69,638 |
| Oct 13, 2025 | Electrical Permit Application | 12 roof mounted solar photovoltaic modules on existing residence. | Greene County | — |
| Oct 6, 2025 | Solar Installation Permit | 12 roof mounted solar photovolitac modules on existing residence. | Greene County | — |
| Jun 25, 2025 | *Residential Solar Installation Permit | 24 roof mounted solar photovoltaic modules on existing residence. | Davie County | $56,808 |
| Feb 6, 2025 | Electric Permit Application | replacing the existing main service panel with a new code compliant main service panel | Lenoir County | — |
| Dec 10, 2024 | Electrical Permit Application | installation of roof mounted photovoltaic solar system - 7 additional modules | Greene County | — |
| Dec 10, 2024 | Solar Installation Permit | installation of roof mounted photovoltaic solar system - 7 addittional modules flush mounted | Greene County | — |
| Dec 5, 2024 | Electric Permit Application | relocation of meter/main combo from existing residence to power wall to provide proper clearnace issued to be code complaint | Lenoir County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.