Contractor · Electrical
LOWE ALAN S & JULIE K
10 building permits since 2019 in Santa Cruz County, CA.
- Building permits
- 10
- Reported job value
- —
- Active
- 2019–2025
- Latest permit
- Nov 25, 2025
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA10
Permits by year
By issue date (application date where there is none).
024
4
20192020202120222025
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 4 |
| 2022 | 2 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Battery storage3
- Solar2
- Bathrooms2
- Electrical2
- Gas1
- HVAC1
- Additions1
- Plumbing1
- Demolition1
- Windows & doors1
Permit types
As the building departments classify them.
- Building10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 25, 2025 | Building | CENTRAL/LRA Repair a 280 SF section of damaged concrete seawall connected to (2) parcels. | Santa Cruz County | — |
| Apr 5, 2022 | Building | Deferred Submittal #2 to Permit B-192995 to include Mechanical Ventilation design. | Santa Cruz County | — |
| Mar 4, 2022 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Change Order (Construction Change Document) # 2 to buil | Santa Cruz County | — |
| Jul 28, 2021 | Building | Construction change document #3 to B-192995, to include fence revisions, 1/2 wall at carport, revise exterior doors and windows at Bath 1 and powder room, chang | Santa Cruz County | — |
| Jun 18, 2021 | Building | Construction change document #1 to B-211739, to include remove (13) PV modules, (1) inverter & (6) 3.0 kWh batteries and replace with (20) PV modules, (20) micr | Santa Cruz County | — |
| May 25, 2021 | Building | Flood Zone VE, X Go on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(4.8)kW, (13) modu | Santa Cruz County | — |
| Mar 16, 2021 | Building | Construction Change Document - Deferred Submittal to B-192995 to include pre-fabricated truss calculations and details. | Santa Cruz County | — |
| Apr 15, 2020 | Building | Construction Change Document #1 to B-192995, to include the addition of a 199 sq. ft. unconditioned basement at an existing SFD under construction. | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.