Contractor · Electrical

L. E. Rhodes Electric

10 building permits since 2019 in Onslow County, NC; Richlands township, NC and Stump Sound township, NC, across 2 counties — $9,000 in reported job value over 2 permits that state one.

Building permits
10
Reported job value
$9K
Active
2019–2026
Latest permit
Sep 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Onslow County, NC2
  • Richlands township, NC2
  • Stump Sound township, NC2
  • Swansboro township, NC1
  • White Oak township, NC1
  • Emerald Isle town, NC1
  • Newport town, NC1

Permits by year

By issue date (application date where there is none).

024
4
201920222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20191
20222
20231
20241
20254
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical8
  • Electric meters2
  • Pools & hot tubs2

Permit types

As the building departments classify them.

  • Residential Electrical - Change Out3
  • Commercial Electrical - Commercial Repair2
  • Commercial Electrical - Commercial Electrical.21
  • Commercial Sign - Commercial Sign Detached1
  • Electrical1
  • Residential Electrical - New1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 29, 2026Residential Electrical - Change OutREPLACE 72 METER PANEL COMBOS (200 AMPS) FOR 72 LOTS. LOT NUMBERS ATTACHED TO RECORDSwansboro township—
Oct 15, 2025Residential Electrical - Change OutREPLACE 200 AMP SERVICE PANELWhite Oak township—
Sep 17, 2025Electrical—Newport Town—
Aug 22, 2025Residential Electrical - Change OutReplace lot electrical service panelOnslow County—
May 20, 2025Commercial Electrical - Commercial RepairChange out circuit in the pool pump roomStump Sound township—
Sep 3, 2024Residential Electrical - NewUtility reconnect (meter inspection)Onslow County—
May 19, 2023Commercial Electrical - Commercial RepairReplacement of pool pump motorStump Sound township—
Aug 3, 2022Commercial Sign - Commercial Sign DetachedRemoval of existing ground sign and installation of lighted ground signRichlands township$4,500

Permit status

Where its permits stand, as the departments report them.

  • Completed6
  • Closed1
  • Issued1
  • Not stated1
  • Approved1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.