Contractor · Electrical
LAND TRUST OF SANTA CRUZ COUNTY
10 building permits since 2004 in Santa Cruz County, CA.
- Building permits
- 10
- Reported job value
- —
- Active
- 2004–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Cruz County, CA10
Permits by year
By issue date (application date where there is none).
024
4
2004201520172026*
View as tableHide table
| Year | Permits |
|---|---|
| 2004 | 1 |
| 2013 | 1 |
| 2015 | 1 |
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 1 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical4
- Solar2
- Accessory dwelling units1
- Battery storage1
- Grading & excavation1
- Remodels1
- Roofing1
- Demolition1
- EV chargers1
- Electric meters1
Permit types
As the building departments classify them.
- Building10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | Building | Install a (N) panel (maximum 125A) to power an existing well on a vacant parcel. Plans not included, processed as an OTC application with routing to zoning only | Santa Cruz County | — |
| Aug 13, 2026 | Building | Replace (E) 400A service panel for a (N) 400A 4-wire/480V OHES for a 50HP well pump station. Like for like. | Santa Cruz County | — |
| Jul 29, 2026 | Building | Electrical permit includes new wiring/lights/switches, for renovations at an existing structure, less than 5 circuits. Verify and/or install listed smoke and ca | Santa Cruz County | — |
| Apr 6, 2026 | Building | Install a roof mount (9.68)kW, (22) modules photovoltaic electrical system not to exceed 32 feet in height at an existing SFD. The Building Inspector may requir | Santa Cruz County | — |
| Nov 27, 2018 | Building | Replace electric service panel with new 200A, 277/480V 3 phase, 3 wire service panel with a new 200A, 277/480V 3 phase, 4 wire panel at an existing SFD. Install | Santa Cruz County | — |
| Sep 20, 2017 | Building | County Fire - LRA 2 new switches for Installation of 3 pole double throw switch & variable frequency drive to accommodate new well & 100 hp well pump. Switch fu | Santa Cruz County | — |
| Jul 11, 2016 | Building | Grading to include 11,200 cubic yards of cut and fill to execute habitat enhancement plan pursuant to Coastal Development Permit 141216. Batch ran @ 7/12/2017 8 | Santa Cruz County | — |
| Jun 10, 2015 | Building | Demolish an existing barn. No other structures on site. | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed5
- Active4
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.