Contractor · Electrical

LAND TRUST OF SANTA CRUZ COUNTY

10 building permits since 2004 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2004–2026
Latest permit
Oct 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

024
4
2004201520172026*
* 2026 is year to date.
View as table
YearPermits
20041
20131
20151
20161
20171
20181
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical4
  • Solar2
  • Accessory dwelling units1
  • Battery storage1
  • Grading & excavation1
  • Remodels1
  • Roofing1
  • Demolition1
  • EV chargers1
  • Electric meters1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2026BuildingInstall a (N) panel (maximum 125A) to power an existing well on a vacant parcel. Plans not included, processed as an OTC application with routing to zoning onlySanta Cruz County—
Aug 13, 2026BuildingReplace (E) 400A service panel for a (N) 400A 4-wire/480V OHES for a 50HP well pump station. Like for like.Santa Cruz County—
Jul 29, 2026BuildingElectrical permit includes new wiring/lights/switches, for renovations at an existing structure, less than 5 circuits. Verify and/or install listed smoke and caSanta Cruz County—
Apr 6, 2026BuildingInstall a roof mount (9.68)kW, (22) modules photovoltaic electrical system not to exceed 32 feet in height at an existing SFD. The Building Inspector may requirSanta Cruz County—
Nov 27, 2018BuildingReplace electric service panel with new 200A, 277/480V 3 phase, 3 wire service panel with a new 200A, 277/480V 3 phase, 4 wire panel at an existing SFD. InstallSanta Cruz County—
Sep 20, 2017BuildingCounty Fire - LRA 2 new switches for Installation of 3 pole double throw switch & variable frequency drive to accommodate new well & 100 hp well pump. Switch fuSanta Cruz County—
Jul 11, 2016BuildingGrading to include 11,200 cubic yards of cut and fill to execute habitat enhancement plan pursuant to Coastal Development Permit 141216. Batch ran @ 7/12/2017 8Santa Cruz County—
Jun 10, 2015BuildingDemolish an existing barn. No other structures on site.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed5
  • Active4
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

LAND TRUST OF SANTA CRUZ COUNTY — Building Permits & Contractor Profile | Buildstats