Contractor · Electrical

Keith Marvin Nolan

164 building permits since 2012 in Orleans Parish, LA.

Building permits
164
Reported job value
—
Active
2012–2026
Latest permit
Sep 1, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA164

Permits by year

By issue date (application date where there is none).

02040
40
20122015202020232026*
* 2026 is year to date.
View as table
YearPermits
201240
20132
201413
20152
201814
201919
202020
20219
202213
202313
20246
20255
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical119
  • Solar39
  • Electric meters39
  • Remodels21
  • HVAC4
  • Kitchens4
  • Generators4
  • Additions3
  • Bathrooms3
  • Pools & hot tubs3

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)3
  • Accessory Structure1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 1, 2026—Install new 320-amp single phase meter socket, 400-amp single phase disconnect fused at 300-amps, and install new service riser and main service ground. The exiOrleans Parish—
Jul 27, 2026—Vacancy inspection. No vacancy repairs needed. 300 Lake Marina Ave Unit 18HOrleans Parish—
Jul 24, 2026—Complete installing outlets, switches, and light fixtures. Finishing installing the 125-amp main electrical service. We are taking over from another electrical Orleans Parish—
Jul 16, 2026—Emergency Reconnect. Main electrical service was hit by lightning. We will replace the existing 200-amp meter/panel combination. We will make the necessary repaOrleans Parish—
May 21, 2026—Renovation of bathroom and two bedrooms. Relocate outlets, switches, and light fixtures for new renovation. We will reuse the existing circuits and extend them Orleans Parish—
Jan 8, 2026—Replace the existing 200-amp main breaker weather proof panel complete with new meter socket and service riser. Reconnect the existing branch circuits to properOrleans Parish—
Jan 8, 2026—Replace the existing 125-amp main breaker weatherproof panel including the meter socket and service riser. We will install a new main service ground.Orleans Parish—
Jan 8, 2026—Replace the existing 125-amp main breaker weatherproof panel complete with a new meter socket and service riser. We will install a new main service ground.Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued110
  • Not stated27
  • C/o issued19
  • Finaled5
  • Closed2
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.