Contractor · Plumbing

Chris Moore

164 building permits since 2022 in Talbot County, MD; Dorchester County, MD and Hurlock town, MD, across 2 counties — $10,880,500 in reported job value over 161 permits that state one.

Building permits
164
Reported job value
$10.9M
Active
2022–2026
Latest permit
Oct 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Talbot County, MD161
  • Dorchester County, MD2
  • Hurlock town, MD1

Permits by year

By issue date (application date where there is none).

02040
39
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
202236
202337
202430
202539
2026 (YTD)22

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing49
  • Demolition41
  • Additions3

Permit types

As the building departments classify them.

  • Marine Construction / Shoreline Stabilization Permit161
  • Building Permit3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 25, 2026Marine Construction / Shoreline Stabilization PermitReplace existing 18' x 8' ramp in-kind.Talbot County$10,000
Oct 25, 2026Marine Construction / Shoreline Stabilization Permit1.) Construct a 95'-long by 8'-wide stone sill (50 cu. yd.), backfill with clean sand (65 cu. yd.) and plant approximately 1,000 sq. ft. with marsh plugs: 500 sTalbot County$150,000
Oct 13, 2026Marine Construction / Shoreline Stabilization PermitRemove an existing pier and associated structures prior to commencement of construction; Construct a 136-foot long by 6-foot wide timber pier with a 10-foot lonTalbot County$70,000
Sep 15, 2026Marine Construction / Shoreline Stabilization PermitDemo (1) mooring piling and existing boat lift. Construct a 15'-long by 5'-wide pier extension and install (2) four-pile boat lifts and associated pilings.Talbot County$20,000
Aug 27, 2026Marine Construction / Shoreline Stabilization PermitDemo existing pier and replace in-kind with modest landward extension into yard for anchoring: 78'-long overall, including a 68' x 5' main pier and a 10' x 20' Talbot County$35,000
Aug 24, 2026Marine Construction / Shoreline Stabilization PermitRepair / Re-construct 124 linear feet of existing stone revetment.Talbot County$40,000
Aug 7, 2026Building PermitConstruct a new 40'-long pier including a 30' x 6' main pier, a 10' x 20' end section platform, and (3) outboard pilings. Install staircase access above MHWL.Hurlock Town—
Aug 7, 2026Building PermitConstruct a new 40'-long pier including a 30' x 6' main pier, a 10' x 20' end section platform, and (3) outboard pilings. Install staircase access above MHWL.Dorchester County—

Permit status

Where its permits stand, as the departments report them.

  • Completed110
  • Active42
  • Stop work ordered12

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.