Contractor · Plumbing
Chris Moore
164 building permits since 2022 in Talbot County, MD; Dorchester County, MD and Hurlock town, MD, across 2 counties — $10,880,500 in reported job value over 161 permits that state one.
- Building permits
- 164
- Reported job value
- $10.9M
- Active
- 2022–2026
- Latest permit
- Oct 25, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Talbot County, MD161
- Dorchester County, MD2
- Hurlock town, MD1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 36 |
| 2023 | 37 |
| 2024 | 30 |
| 2025 | 39 |
| 2026 (YTD) | 22 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing49
- Demolition41
- Additions3
Permit types
As the building departments classify them.
- Marine Construction / Shoreline Stabilization Permit161
- Building Permit3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 25, 2026 | Marine Construction / Shoreline Stabilization Permit | Replace existing 18' x 8' ramp in-kind. | Talbot County | $10,000 |
| Oct 25, 2026 | Marine Construction / Shoreline Stabilization Permit | 1.) Construct a 95'-long by 8'-wide stone sill (50 cu. yd.), backfill with clean sand (65 cu. yd.) and plant approximately 1,000 sq. ft. with marsh plugs: 500 s | Talbot County | $150,000 |
| Oct 13, 2026 | Marine Construction / Shoreline Stabilization Permit | Remove an existing pier and associated structures prior to commencement of construction; Construct a 136-foot long by 6-foot wide timber pier with a 10-foot lon | Talbot County | $70,000 |
| Sep 15, 2026 | Marine Construction / Shoreline Stabilization Permit | Demo (1) mooring piling and existing boat lift. Construct a 15'-long by 5'-wide pier extension and install (2) four-pile boat lifts and associated pilings. | Talbot County | $20,000 |
| Aug 27, 2026 | Marine Construction / Shoreline Stabilization Permit | Demo existing pier and replace in-kind with modest landward extension into yard for anchoring: 78'-long overall, including a 68' x 5' main pier and a 10' x 20' | Talbot County | $35,000 |
| Aug 24, 2026 | Marine Construction / Shoreline Stabilization Permit | Repair / Re-construct 124 linear feet of existing stone revetment. | Talbot County | $40,000 |
| Aug 7, 2026 | Building Permit | Construct a new 40'-long pier including a 30' x 6' main pier, a 10' x 20' end section platform, and (3) outboard pilings. Install staircase access above MHWL. | Hurlock Town | — |
| Aug 7, 2026 | Building Permit | Construct a new 40'-long pier including a 30' x 6' main pier, a 10' x 20' end section platform, and (3) outboard pilings. Install staircase access above MHWL. | Dorchester County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed110
- Active42
- Stop work ordered12
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.