Contractor · Electrical
JD ELECTRICAL HOME SOLUTIONS LLC
10 building permits since 2023 in Boulder city, CO — $43,527 in reported job value over 9 permits that state one.
- Building permits
- 10
- Reported job value
- $43.5K
- Active
- 2023–2026
- Latest permit
- Jun 3, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder city, CO10
Permits by year
By issue date (application date where there is none).
048
8
202320242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 8 |
| 2024 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Solar1
Permit types
As the building departments classify them.
- Electrical Permit10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 3, 2026 | Electrical Permit | Remove and replace existing conduit connectors and couplings associated with eleven (11) exterior light fixtures. Existing fixtures, conduit, and conductors wil | Boulder | $3,989 |
| Oct 10, 2024 | Electrical Permit | 200 amp basic panel upgrade, 200amp sub panel w/ specialty breaker. | Boulder | $13,048 |
| Aug 21, 2023 | Electrical Permit | Installation of 70Amp subpanel with 70Amp main breaker sub panel. Reuse the existing 4 wire circuit that is feeding the existing panel. We will not be adding an | Boulder | $5,655 |
| Aug 15, 2023 | Electrical Permit | Installation of 70Amp subpanel with 70Amp main breaker sub panel. Reuse the existing 4 wire circuit that is feeding the existing panel. We will not be adding an | Boulder | $5,655 |
| Jul 27, 2023 | Electrical Permit | installation of a 70Amp subpanel with 70Amp main breaker sub panel. Reuse the existing 4 wire circuit that is feeding the existing panel. We will not be adding | Boulder | $1,500 |
| Jul 13, 2023 | Electrical Permit | Remove and replace 70Amp subpanel with 70Amp main breaker sub panel. Reuse the existing 4 wire circuit that is feeding the existing panel. We will not be adding | Boulder | $4,000 |
| Jun 29, 2023 | Electrical Permit | Remove and replace 70Amp subpanel with 70Amp main breaker sub panel. Reuse the existing 4 wire circuit that is feeding the existing panel. We will not be adding | Boulder | $2,100 |
| Jun 23, 2023 | Electrical Permit | Remove and replace 70Amp subpanel with 70Amp main breaker sub panel. Reuse the existing 4 wire circuit that is feeding the existing panel. We will not be adding | Boulder | $2,100 |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.