Contractor · Electrical
JACOB CHU
10 building permits since 2022 in Cypress city, CA; La Habra city, CA and Norwalk city, CA, across 2 counties.
- Building permits
- 10
- Reported job value
- —
- Active
- 2022–2026
- Latest permit
- Sep 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cypress city, CA6
- La Habra city, CA2
- Norwalk city, CA1
- Rosemead city, CA1
Permits by year
By issue date (application date where there is none).
048
8
202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2024 | 1 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- EV chargers6
Permit types
As the building departments classify them.
- Electrical Panel Change or Upgrade3
- Electrical Vehicle Charging Station3
- Electrical2
- Electrical Permit1
- Residential Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 10, 2026 | Electrical Permit | MAIN PANEL UPGRADE FROM 100AMPS TO 200 AMPS AND (N) 240V EV OUTLET. | Rosemead City | — |
| Aug 4, 2026 | Residential Electrical | MAIN PANEL UPGRADE 200 AMPS. INSTALL NEMA 14-50A OUTLET. | Norwalk City | — |
| Jun 25, 2026 | Electrical Vehicle Charging Station | NEMA 14-50 OUTLET | Cypress City | — |
| Jun 19, 2026 | Electrical Panel Change or Upgrade | Upgrade main panel 200 Amps | Cypress City | — |
| Mar 31, 2026 | Electrical Vehicle Charging Station | NEMA 14-50 OUTLET | Cypress City | — |
| Mar 26, 2026 | Electrical Panel Change or Upgrade | Upgrade main panel 200 Amps | Cypress City | — |
| Jan 14, 2026 | Electrical | Main panel upgrade to 200 amps per sce approval in existing right side of house and nema 14-50 outlet for ev located in exterior right side of house. | La Habra City | — |
| Jan 14, 2026 | Electrical | Main panel upgrade to 200 amps per sce approval in existing right side of house and nema 14-50 outlet for ev located in exterior right side of house. | La Habra City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed6
- Finaled3
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.