Contractor · General building

HOME IMPROVEMENT PROJECTS

10 building permits since 2017 in San Diego County, CA; Vista city, CA and Oceanside city, CA — $288,975 in reported job value over 5 permits that state one.

Building permits
10
Reported job value
$289K
Active
2017–2020
Latest permit
Jul 11, 2020

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA4
  • Vista city, CA4
  • Oceanside city, CA2

Permits by year

By issue date (application date where there is none).

02.55
5
201720182020
View as table
YearPermits
20175
20183
20202

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing3
  • Solar2
  • Additions2
  • Electrical2
  • Accessory dwelling units1
  • HVAC1
  • Remodels1
  • Bathrooms1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Existing3
  • Building Residential Case2
  • BLD ROOFING1
  • BLD SOLAR PV RES1
  • Building Misc - Retaining Block/Wall1
  • Building Temporary Power Pole1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 11, 2020—286 SQFT DET WORKSHOP W/ ELECTRICAL AND 423 SQFT SFD ADDITION AND INT REMODEL TO INCLUDE 54 LF INT PARTITION REMOVED/ADDED, REPLACE DOORS/WINDOWS FOR EXISTING SSan Diego County$73,928
Jan 13, 2020Building Misc - Retaining Block/Wall4'11" RETAINING WALL W/ 6' VINYL FENCE ON TOP (300 SF)Vista City$15,000
Oct 29, 2018Building Temporary Power Pole200 AMP TEMPORARY POWER POLEVista City—
Aug 15, 2018Building Residential CaseADD FAMILY ROOM, BEDROOM, BATHROOM, AND DECK. RE-ROOF WHOLE HOUSE.Vista City$75,000
Aug 15, 2018Building Residential CaseDETACHED GARAGE W/SECOND UNIT ABOVEVista City$108,443
Nov 20, 2017Existing28 SQ FT, RE-ROOF FOR (E) SFD. If a re-roof project is proposed, the following specifications apply. Existing roofing material: COMP SHINGLE Proposed roofing maSan Diego County$16,604
Oct 11, 2017ExistingHVAC Change Out - Split System - (Online Permit) *This project must comply with the current Building Energy Efficiency Standards. Registered Title 24 forms mustSan Diego County—
Oct 10, 2017ExistingHRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled5
  • Issued2
  • Expired2
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.