Contractor · General building

HERMAN MERIT B

10 building permits since 2013 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2013–2022
Latest permit
Dec 1, 2022

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

024
4
20132015201820212022
View as table
YearPermits
20132
20154
20181
20212
20221

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical3
  • Kitchens2
  • Remodels2
  • Bathrooms2
  • HVAC1
  • Solar1
  • Plumbing1
  • Windows & doors1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 1, 2022BuildingUnit 2 Kitchen and bathroom remodel to include updating fixtures. Install or verify listed smoke detectors and carbon monoxide alarms or combination smoke and cSanta Cruz County—
Nov 29, 2021BuildingConstruction change document #1 to B-215300, to include added a subpanel (bus rating 100A) and enphase IQ envoy (for monitoring) in a 12x12x06 cantex outdoor raSanta Cruz County—
Oct 25, 2021BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount (3.74 )kW, (11 ) modules photovoltSanta Cruz County—
May 30, 2018BuildingCode case# NV23891/stop work# 14573 Recognize as-built replacement concrete retaining wall (72ft. long x approx. 3.5ft in height) to include hardscape improvemeSanta Cruz County—
Jul 23, 2015BuildingConstruct two(2) second level Decks(160sq.ft.) at an existing 2-story SFD.Santa Cruz County—
Mar 18, 2015BuildingChange order to B-144620 (REM) to include convert current laundry to linen closets, relocate laundry to garage, replace/relocate furnace to attic, replace/relocSanta Cruz County—
Mar 9, 2015BuildingChange order to B-144620 (REM) to include replace electric service panel with new 200A service panel and replace all exterior siding.Santa Cruz County—
Jan 20, 2015BuildingInterior remodel at an existing (3) bedroom, (2) bath 2-story SFD to include remodel kitchen and remodel/expand master bath at upper floor. Remodel existing batSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.