Contractor · Electrical

GUNST CHRISTOPHER L & JENNIFER LEE

10 building permits since 2019 in Santa Cruz County, CA.

Building permits
10
Reported job value
—
Active
2019–2026
Latest permit
Nov 3, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA10

Permits by year

By issue date (application date where there is none).

01.53
3
201920202022202420252026*
* 2026 is year to date.
View as table
YearPermits
20191
20203
20223
20241
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical5
  • Bathrooms3
  • Solar2
  • Remodels2
  • EV chargers2
  • Windows & doors2
  • Accessory dwelling units1
  • Gas1
  • Additions1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 3, 2026BuildingInstall (1) electric vehicle charging system (EVCS) level 2, (11.5)kW / 240VAC for an existing SFD. Verify and/or install listed smoke and carbon monoxide alarmSanta Cruz County—
Mar 7, 2025BuildingConstruction Change Document #1 to Permit B-236395 to include: Change of emergency escape window location from West to North. Adjust window sizes on North elevaSanta Cruz County—
Jun 4, 2024BuildingConstruct a (N) attached 893 SF. 2-story ADU with 150 SF uncovered deck attached to existing SFD with swim spa and uncovered deck. Install listed smoke detectorSanta Cruz County—
Oct 17, 2022BuildingConstruction Change Document (Change Order) #2 to permit B-192585 to remodel and increase size of first floor rear bathroom by roughly 25 sq ft, modify the layoSanta Cruz County—
Jul 20, 2022Building6-month extension granted to deal with change order items and field changes during construction. Extension granted to 1/20/2023.Santa Cruz County—
Jun 13, 2022BuildingCombination MEP permit to remodel the existing first floor rear 84 sq ft bathroom. Remodel includes removing and replacing all existing electrical, plumbing fixSanta Cruz County—
Nov 23, 2020BuildingLRA/Central FPD Replace existing 100A electric service panel with new 200A service panel, solar ready meter load center at an existing SFD. Install listed smokeSanta Cruz County—
Apr 27, 2020BuildingChange Order to B-192585 (RA/REM) to include change siding from wood to stucco at rail height, second level down and changes to windows at East, South & West elSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Active2
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.