Contractor · Electrical
GUNST CHRISTOPHER L & JENNIFER LEE
10 building permits since 2019 in Santa Cruz County, CA.
- Building permits
- 10
- Reported job value
- —
- Active
- 2019–2026
- Latest permit
- Nov 3, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA10
Permits by year
By issue date (application date where there is none).
01.53
3
201920202022202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2020 | 3 |
| 2022 | 3 |
| 2024 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical5
- Bathrooms3
- Solar2
- Remodels2
- EV chargers2
- Windows & doors2
- Accessory dwelling units1
- Gas1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- Building10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 3, 2026 | Building | Install (1) electric vehicle charging system (EVCS) level 2, (11.5)kW / 240VAC for an existing SFD. Verify and/or install listed smoke and carbon monoxide alarm | Santa Cruz County | — |
| Mar 7, 2025 | Building | Construction Change Document #1 to Permit B-236395 to include: Change of emergency escape window location from West to North. Adjust window sizes on North eleva | Santa Cruz County | — |
| Jun 4, 2024 | Building | Construct a (N) attached 893 SF. 2-story ADU with 150 SF uncovered deck attached to existing SFD with swim spa and uncovered deck. Install listed smoke detector | Santa Cruz County | — |
| Oct 17, 2022 | Building | Construction Change Document (Change Order) #2 to permit B-192585 to remodel and increase size of first floor rear bathroom by roughly 25 sq ft, modify the layo | Santa Cruz County | — |
| Jul 20, 2022 | Building | 6-month extension granted to deal with change order items and field changes during construction. Extension granted to 1/20/2023. | Santa Cruz County | — |
| Jun 13, 2022 | Building | Combination MEP permit to remodel the existing first floor rear 84 sq ft bathroom. Remodel includes removing and replacing all existing electrical, plumbing fix | Santa Cruz County | — |
| Nov 23, 2020 | Building | LRA/Central FPD Replace existing 100A electric service panel with new 200A service panel, solar ready meter load center at an existing SFD. Install listed smoke | Santa Cruz County | — |
| Apr 27, 2020 | Building | Change Order to B-192585 (RA/REM) to include change siding from wood to stucco at rail height, second level down and changes to windows at East, South & West el | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed7
- Active2
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.