Contractor · Electrical

IMPERIAL SOLAR INC

166 building permits since 2017 in Los Angeles city, CA; Camarillo city, CA and Burbank city, CA, across 2 counties.

Building permits
166
Reported job value
—
Active
2017–2026
Latest permit
Feb 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA161
  • Camarillo city, CA3
  • Burbank city, CA1
  • Thousand Oaks city, CA1

Permits by year

By issue date (application date where there is none).

04080
67
20172019202120232026*
* 2026 is year to date.
View as table
YearPermits
20175
201816
201920
202037
202167
202214
20235
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical163
  • Solar46
  • Roofing4
  • Battery storage1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical162
  • RESIDENTIAL ROOFTOP SOLAR SYSTEM3
  • Electrical Service1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 23, 2026ElectricalInstall new flush roof-mounted, low-profile pv solar system. Total solar panel modules quantity: 36 total inverters: 36 , 15.84 kw dc, sq. Ft. Array area: 756 ,Thousand Oaks City—
Jan 14, 2025Electrical ServiceNEW 200 AMP SERVICE WITH ONE METERBurbank City—
May 17, 2023ElectricalPermit fee is $0.00 due to AB1414 Eplan: Roof mount Solar system ratLos Angeles City—
Apr 21, 2023RESIDENTIAL ROOFTOP SOLAR SYSTEM—Camarillo City—
Feb 16, 2023Electrical[E-Plan] New PV1 roof mounted solar system consisting of 38 modules wiLos Angeles City—
Jan 18, 2023ElectricalEPLAN: ROOF MOUNT INSTALLATION OF 11.20KW DC 9.1KW AC PHOTOVOLTAICLos Angeles City—
Jan 13, 2023RESIDENTIAL ROOFTOP SOLAR SYSTEM—Camarillo City—
Nov 9, 2022ElectricalPlan check for PV roof mounted system, PV System size: 15.2KW DC, 13.9Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated161
  • Finaled5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.