Contractor · Electrical
EV CHARGING INSTALLERS OF AMERICA LLC
10 building permits since 2021 in Howard County, MD; Arlington County, VA and Rockville city, MD, across 3 counties.
- Building permits
- 10
- Reported job value
- —
- Active
- 2021–2026
- Latest permit
- Oct 9, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD5
- Arlington County, VA4
- Rockville city, MD1
Permits by year
By issue date (application date where there is none).
024
4
20212023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 3 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- EV chargers10
Permit types
As the building departments classify them.
- Commercial Electrical Permit3
- Electrical3
- Residential Electrical Miscellaneous Permit2
- CTBO1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 9, 2026 | Electrical | installing (1) 45kVA transformer; (1) 208v 125A sub panel and (4) ev charging stations on (2) bolted-down dual-pedestals and (2) bolted-down bollards and accomp | Arlington County | — |
| Jun 1, 2026 | Electrical | INSTALLING (1) 45KVA TRANSFORMER AND (1) 125A PANEL. 6 NEW LEVEL 2 CHARGING STATIONS WITH ACCOMPANYING CONDUITS, CABLE, BREAKERS, ETC. TO PROVIDE A COMPLETE INS | Arlington County | — |
| May 7, 2026 | CTBO | Installing 11 bolt-down bollards for 13 - 6.7 KW level 2 ev charging stations that will also be bolted down in parking garage | Arlington County | — |
| Jan 21, 2026 | Commercial Electrical Permit | Dunkin parking lot/ (1) 1200-amp service; (1) 1200-amp panel-feeder; (2) 400kw ev chargers, (1) 600kw power unit, (1) 750kva transformer *Rec'd amendment on 03/ | Howard County | — |
| Dec 31, 2025 | — | Installation of 4 Level 2 charging stations located in the parking garage with accompanying conduits, cable, panels, breakers etc. to provide a complete install | Rockville City | — |
| Apr 2, 2025 | Residential Electrical Miscellaneous Permit | Installation of (1) 48a electric vehicle charger; Location - garage | Howard County | — |
| Apr 2, 2025 | Residential Electrical Miscellaneous Permit | Installation of (1) 48a electric vehicle charger; Location - garage | Howard County | — |
| Aug 2, 2024 | Commercial Electrical Permit | Giant food/ (1) 125 amp panel-feeder; Installation of (2) electric vehicle charging station fixtures to be located in (3) parking spaces that are part of an exi | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed5
- Additional information required2
- Closed1
- Finaled1
- Pending1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.