Contractor · Electrical

EASY DAY REI LLC

10 building permits since 2011 in Piney Green CDP, NC; Onslow County, NC and Stump Sound township, NC.

Building permits
10
Reported job value
—
Active
2011–2026
Latest permit
Oct 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Piney Green CDP, NC4
  • Onslow County, NC2
  • Stump Sound township, NC1
  • Swansboro township, NC1
  • White Oak township, NC1
  • Half Moon CDP, NC1

Permits by year

By issue date (application date where there is none).

024
4
20112022202320242026*
* 2026 is year to date.
View as table
YearPermits
20111
20221
20232
20244
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical2
  • Electric meters1

Permit types

As the building departments classify them.

  • EH Construction Authorization - Repair3
  • EH Improvement Permit - New2
  • EH Existing System - New1
  • EH Historical Record1
  • EH Operation Permit - Repair1
  • Residential Electrical - Change Out1
  • Residential Electrical - Utility Reconnect1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 12, 2026EH Improvement Permit - New—Onslow County—
Sep 24, 2026Residential Electrical - Change OutExterior panel change outPiney Green CDP—
Sep 24, 2024EH Historical Record1127 Old Tar Landing RoadOnslow County—
Jun 26, 2024EH Construction Authorization - Repair653 Grants Creek Rd.White Oak township—
May 23, 2024EH Existing System - New890 Lynchburgh Drive / Highland Forest Lot 21Piney Green CDP—
Feb 7, 2024EH Construction Authorization - Repair890 Lynchburg Drive / Highland Forest Lot 21Piney Green CDP—
Dec 29, 2023EH Improvement Permit - New890 Lynchburg Drive / Highland Forest Lot 21Piney Green CDP—
Apr 17, 2023Residential Electrical - Utility ReconnectDuke has requested inspection to be done by county before they install meter back on house.Half Moon CDP—

Permit status

Where its permits stand, as the departments report them.

  • Not stated4
  • Documents submitted2
  • Closed1
  • Approved1
  • Completed1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.