Contractor · Electrical

Draven Electric

10 building permits since 2019 in Mesquite city, NV.

Building permits
10
Reported job value
—
Active
2019–2024
Latest permit
May 20, 2024

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Mesquite city, NV10

Permits by year

By issue date (application date where there is none).

01.53
3
20192020202120232024
View as table
YearPermits
20193
20202
20213
20231
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical7
  • Additions1
  • Demolition1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 20, 2024—Temp power routing based on existing circuitsMesquite City—
Jan 12, 2023—Demolition of old walk in cooler/replace with existing circuits. All existing loads to be reduced inside by 50%.Mesquite City—
Sep 28, 2021—Installation of conduit/wire for outlets/lightingMesquite City—
Mar 9, 2021—Power Routing for slot machines..... 03-09-2021 01:14:33 pm (Jeffrey Shaffer) - Located at the southeast entrance.Mesquite City—
Feb 4, 2021—Outdoor site lightingMesquite City—
Aug 26, 2020—Conduit/wire/new circuits/power routing/trouble shooting/code upgrade....Annual PermitMesquite City—
Jun 26, 2020—Conduit/wire/new circuits/power routing/trouble shooting/code upgrade....Annual PermitMesquite City—
Apr 18, 2019—Relocation of existing recepticle & circuitMesquite City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.